Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

QSJ RCLR Road Repair
Infrastructure
Post-Bid
$125,000 to $145,000 est. value
Hillsboro, OR 97124

Pavement Maintenance, Installation, Repair and Concrete Grinding Services
Infrastructure
Post-Bid
Hillsboro, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

US26 at Mendenhall Creek MP 45.45 to 45.71 Project
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Park Place Bridgeport Mixed Use
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Pipeline Construction
Infrastructure
Post-Bid
$400,000 est. value
Beaverton, OR

SW 209th Avenue SW Kinnaman Road - SW Alexander Street
Infrastructure, Alteration
Results
$15,000,000 to $25,000,000 est. value
Aloha, OR 97007

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Last Updated 07/25/2023 03:24 PM
Project Title

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline

Physical Address View project details and contacts
City, State (County) Tualatin, OR 97062   (Washington County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $69,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this contract consists of the following in Washington County: 1. Implement temporary traffic control and temporary erosion control measures 2. Perform earthwork 3. Install new drainage features including pipe, manholes, and inlets 4. Construct retaining walls 5. Construct stormwater management facilities 6. Perform cold plane pavement removal 7. Construct aggregate base and asphalt concrete pavement 8. Construct concrete curbs, gutters, islands, sidewalks, raised bike lanes and driveways 9. Install permanent signing and striping 10. Install illumination and traffic signals 11. Install permanent seeding, landscaping, and irrigation system 12. Construct 66-inch asphalt lined welded steel water transmission pipeline and appurtenances 13. Install potable water pipe and appurtenances. 14. Perform additional and incidental Work as called for by the Specifications and Plans. The Project cost range is $53,000,000 - $69,000,000 Project Contacts: Matt Meier, Project Manager 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7829 Fax: 503-846-7810 Kira Furby, Engineering Associate 1400 SW Walnut St, MS #18 Hillsboro, OR 97123-5625 Phone: 503-846-7816.The County reserves the right to waive any irregularities or informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Please access the Pre-Bid Meeting via the following link: Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) +1 971-337-3439,,809064521# United States, Portland Phone Conference ID: 809 064 521# Find a local number | Reset PIN

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents