Similar Projects
Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

Construction of South Post Oak Sportsplex Baseball Fields Phase II for Fort Bend County
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Houston, TX 77053

Re-Bid - Fulbrook on Fulshear Section 19, Phase 1b - Paving Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Fulshear, TX 77441

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Distribution System Water Main Rehabilitation Program in Sugar Creek Subdivision
Results
$1,776,554 est. value
Houston, TX 77099

Offsite 16-inch Water Line and 8-inch Force Main
Infrastructure
Results
TX

Lake Olympia at Vicksburg / The Shops at Lake Olympia
New Construction, Infrastructure - 17,400 SF
Construction
$1,479,000 CJ est. value
Missouri City, TX 77489

TDPS Driver License Office - Rosenberg
New Construction, Infrastructure - 23,212 SF
Construction
$3,400,000 CJ est. value
Rosenberg, TX 77471

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Nexus Apartments
New Construction, Infrastructure
Pending Verification
$999,999 CJ est. value
Stafford, TX 77477

RFQ D/B - FY22 Capital Improvement Drainage Projects: Oyster Creek Diversion Channel and Detention Facilities
Infrastructure
Design
$960,000 CJ est. value
Sugar Land, TX 77478

Construction of Fulbrook on Fulshear Creek Section 18 Paving Improvements
Infrastructure
Bidding
$842,746 CJ est. value
Fulshear, TX 77441

Storm Sewer, Sanitary Sewer and Water Lines to Serve Briarwood Crossing Section 15 and Briarwood Crossing Drive Ext. Phase 2
Infrastructure
Post-Bid
TX

Last Updated 11/23/2022 10:36 AM
Project Title

City Hall Power Wash and Masonry Sealant Project

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Capitol/Court House/City Hall, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 11/23/2022 project will not be awarded. Completely power wash entire exterior masonry, cast stone and CMU for the Sugar Land City Hall Building and apply penetrating, water-based, water, salt and chloride resistant concrete sealer for masonry, cast stone and CMU sealer as described below. Power wash process: If water only (no soaps/solvents) sandbag area storm drain inlets. Any solvents/soaps must be recovered. Protect landscape and use barrier methods to protect pedestrian traffic. Sealant application process: Provide safety barriers to protect pedestrians. Protect against property damages when moving and utilizing lift equipment. Avoid over spray on window glass, frames and landscape. Assure all masonry, cast stone and CMU is adequately applied getting product well into rough surfaces of each material for consistency when wet. Provide the manufacturer's application recommendation for each type of material (Masonry, cast stone, CMU). A manufacturer's representative is required to make a field visit to review the project and verify the application process for the workers and City Facilities staff. (number of applications and drying times). Manufacturer to provide recommend PSI for building pressure wash cleaning. Provide square footage estimate for the building and the amount of sealer to be used. Installer shall include final clean up including ensuring all windows are streak free from any residue. A project supervisor is required on site at all times who can effectively communicate with City staff. Provide a detailed schedule for proposed work for coordination with City staff.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents