Last Updated | 09/27/2022 10:12 AM |
Project Title | 2023 Douglas Municipal Airport Water and Sewer Improvements |
Physical Address | View project details and contacts |
City, State (County) | Douglas, GA 31535 (Coffee County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $221,851 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of September 27, 2022, project was awarded to RPI Underground Inc, awarded amount is $221,851.20.** The Scope of Work Includes: Water and Sewer Improvements (Extension) All proposals shall be accompanied by a Bid Bond in favor of the City of Douglas in the amount of at least five percent (5%) of the lump sum bid for the complete work: such Bid Bond representing that the Bidder, if awarded a Contract, will promptly enter into a Contract and furnish Performance Bond and Payment Bonds as provided by the law and approved by the Attorney for the City of Douglas. Performance Bond shall be equal to 100 Percent (100%) of the contract amount and Payment Bond shall be equal to 100 percent (100%) of the Contract amount. The Bid Bond shall be forfeited to the City of Douglas as liquidated damages if the Bidder fails to execute the Contract and provide Performance and Payment Bonds within (10) days after being notified that he has been awarded the Contract All work on the project must be completed within 120 consecutive calendar days of date of Notice to Proceed. The Georgia Department of Transportation Standard Specifications, 2021 Edition, any applicable Supplemental Specifications, Special Provisions, or any other provision contained within this contract will be applicable to this project. All materials, workmanship, testing, etc. shall meet the Georgia Department of Transportation Specifications. Any work required in excess of 4 feet deep shall be performed by a contractor or subcontractor having a valid Georgia Utility License. This requirement is defined in Chapter 14 of Title 43 of the Official Code of Georgia and issued by the State of Georgia Secretary of State. Even though this project may not reach nor exceed minimum requirements such as depth of trench, project construction cost, etc. as described by the Chapter 14 of Title 43 of the Official Code of Georgia, the prime contractor submitting the bid or the subcontractor performing the utility related work must hold a valid Georgia Utility Contractor License. The utility license number must be placed with the bid or the bid will be rejected. The Owner reserves the right to reject all bids and to waive informalities, and to accept any Bid which in its opinion may be in the best interest of the Owner. The Owner has the right to add or to delete from the Contract once it has been awarded. No bids shall be withdrawn for a period of 60 days after the opening of the bids. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |