Similar Projects
810 Pine Street Residential Assisted Living Community
New Construction - 32,000 SF
Design
$20,000,000 est. value
Long Beach, CA 90813

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

El Nido Senior Care Facility
New Construction, Renovation - 30,621 SF
Design
$1,000,000 to $5,000,000 CJ est. value
San Ramon, CA 94583

Assisted Living and Memory Care Units
New Construction
Pending Verification
Los Angeles, CA 90049

Pico Robertson Senior Housing
New Construction
Design
Los Angeles, CA

Cadence Senior Living
Renovation - 10,878 SF
Post-Bid
Poway, CA 92064

Supportive Housing Development
New Construction
Conception
Palmdale, CA 93550

The Bellwood
New Construction, Demolition - 241,754 SF
Pending Verification
$10,000,000 CJ est. value
Los Angeles, CA 90064

Five Star Senior Living - Remington 1 - Lobby and Common Spaces
New Construction - 15,160 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
San Diego, CA 92128

Five Star Remington Club - Lobby II
New Construction, Renovation, Addition - 15,555 SF
Post-Bid
San Diego, CA 92128

California Veteran Home Skilled Nursing Facility and Memory Care
New Construction - 285,000 SF
Design
$285,000,000 est. value
Yountville, CA

Eagle Landing Senior Housing
New Construction
Design
Los Angeles, CA 90041

Spirit Living Mixed-Use Development
New Construction
Conception
Petaluma, CA 94952

Reported 09/28/2021 10:54 AM
Project Title

Homeless Housing Sites

Physical Address View project details and contacts
City, State (County) San Jose, CA   (Santa Clara County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is not centered in one location. The owner/developer is looking to supply housing for the homeless in several different areas of the surrounding region over the next several years.

Details

Assisted Living Facility, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents