Similar Projects
Reconstruction Trail and Bridges
New Construction, Infrastructure
Bidding
Middleton, WI

Demetral Park Path - Phase 2
Infrastructure
Bidding
$363,522 est. value
Madison, WI 53704

2021 Street Pulverization
Post-Bid
Stoughton, WI

Sunfish Pond Parking Lot
Post-Bid
Deforest, WI

Boardwalk Replacement
Results
De Forest, WI 53532

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

State Street Sidewalk Repairs and North Park Street Sidewalk and Terrace Assessment District 2021
Infrastructure
Post-Bid
Less than $444,299 est. value
Madison, WI 53787

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

2021 Street and Path Improvements
Infrastructure
Post-Bid
Fitchburg, WI

Spring Green - Madison, Walter Road
Results
WI

Helena Street, Jenifer Street, and Russell Street Assessment District - 2021
Infrastructure
Post-Bid
$3,240,000 est. value
Madison, WI 53704

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Hooker Avenue, Sheridan Drive, Steensland Drive Resurfacing Assessment District - 2021
Infrastructure
Post-Bid
$1,242,684 est. value
Madison, WI 53704

Hubbard Avenue, Mayflower Drive, Violet Place, Orchid Lane Reconstruction
Results
Less than $2,472,200 est. value
Middleton, WI 53562

Parking Lots, Curbs, and Exterior Lighting - MEP
Results
$570,000 est. value
Madison, WI 53718

Last Updated 06/25/2021 02:18 PM
Project Title

Glacial Drumlin Trail

Physical Address View project details and contacts
City, State (County) Cottage Grove, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $552,357
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of approximately 3000 LF of asphalt bike path construction, to become part of the Glacial Drumlin State Trail, and the reconstruction of approximately 500 LF of Clark Street. Additional improvements include water service replacements, storm sewer, concrete sidewalk, ADA ramps, pavement markings, signage, including a rectangular rapid flashing beacon (RRFB), pond grading, and improvements to the front porch of a private residence.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents