Similar Projects
2021 Road Maintenance
Infrastructure
Bidding
Winfield, IN

Fairbanks Street Improvement
Infrastructure
Bidding
Cedar Lake, IN 46303

Hidden Lake Park Paving
Post-Bid
Merrillville, IN 46410

109th Avenue at Colorado Street Road Construction
Post-Bid
Crown Point, IN 47283

Downtown Parking Lot Renovation
Renovation
Results
Highland, IN 46322

2020 CCMG Street Improvement
Renovation
Results
Highland, IN 46322

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Bidding

IDIQ, Patch and Rehab Pavement
Term Contract
Post-Bid

Community Crossing Street Resurface Program
Results
Lake Station, IN 46405

2021 Street Resurfacing Projects
Infrastructure
Bidding
Schererville, IN

2021 Hammond Community Crossing Project HMA Milling and Resurfacing
Post-Bid
Hammond, IN 46320

Median Construction
Results
Hammond, IN 46320

101st Avenue, State Line Road and Exchange Street Improvement
Post-Bid
Crown Point, IN 46307

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Saint John Community Crossing`s Road Improvements
Post-Bid
Saint John, IN

Last Updated 06/22/2021 01:05 PM
Project Title

109th Avenue at Grand Boulevard Improvements

Physical Address View project details and contacts
City, State (County) Winfield, IN   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of roadway reconstruction for sight distance corrections, the addition of turnlanes, the addition of a passingblister and the addition or replacement of storm water infrastructure in the right-of-way of the roadways.Additionally, the installation of anupsized 6’x9’ box structure drain-age culvert under 109th Avenue inthe intersection is also included.Installation of the drainage culvert will also require reconstruction of Deer Creek at north end of culvert. Project limits are approximately 500feet north of 109th Avenue on Grand Boulevard, 1,000 west and500 feet east of Grand Boulevardon 109th Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents