Similar Projects
Blue Star Solar Farm
New Construction, Renovation
Conception
Monroe, NC 28112

Construction of New Electric Substation S on US Highway 601S - City of Concord
New Construction
Conception
Less than $5,000,000 est. value
Concord, NC 28026

Residence Inn By Marriott / Asheville
New Construction, Infrastructure - 86,000 SF
Design
$25,000,000 CJ est. value
Asheville, NC 28801

Cottages at College Acres Phase 4
New Construction, Infrastructure - 12,800 SF
Design
$1,000,000 CJ est. value
Wilmington, NC 28403

Clinton Waste Water Treatment Plant Resiliency Improvements
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Clinton, NC 28328

RFP D/B - Middlesex Corporate Centre Shell Building 2 Request for Design Build Bridging
New Construction, Infrastructure - 60,000 SF
Bidding
$800,000 CJ est. value
Middlesex, NC 27557

Neuse River Resource Recovery Facility (NRRRF) Bioenergy Recovery Project (BERP) - BP 12 - Sidestream Treatment
New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Raleigh, NC 27610

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Duke Solar Farm
New Construction
Construction
Asheville, NC 28804

Red Springs High School Athletic Complex
Construction
$3,000,000 to $4,000,000 est. value
Red Springs, NC 28377

Birkdale Golf Club Mixed Use
New Construction, Infrastructure - 68,188 SF
Pending Verification
$45,000,000 CJ est. value
Huntersville, NC 28078

The Residence at Canopy Point
New Construction, Infrastructure
Pending Verification
$26,400,000 CJ est. value
Wilmington, NC 28411

Construction of New Electric Substation R on Poplar Tent Road - City of Concord
New Construction
Conception
$4,945,000 est. value
Concord, NC 28026

Last Updated 10/31/2022 02:34 PM
Project Title

Replace Substation 1 Equipment - City of Rocky Mount

Physical Address View project details and contacts
City, State (County) Rocky Mount, NC 27801   (Edgecombe County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will replace outdated substation equipment at sub 1 - FY2023 - Replace 12 KV breakers at sub 1. As of October 31, 2022, this project is included in the City of Rocky Mount's FY 2023 - 2027 CIP and funding for construction is allocated for FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents