Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,114,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing
Infrastructure
Conception
$4,014,000 CJ est. value
Olivet, SD 57052

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Modify Intersection, PCC Surfacing
Infrastructure
Design
$3,600,000 CJ est. value
Harrold, SD 57536

Grading, Rubbilize PCC, Asphalt Concrete Surfacing
Infrastructure
Bidding
$8,260,000 CJ est. value
Brookings, SD 57006

Replace Str Bridge, Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$9,261,000 CJ est. value
Philip, SD 57567

Wellness Center Expansion Bid Package #2
Addition, Demolition, Infrastructure
Sub-Bidding
$4,134,735 CJ est. value
Vermillion, SD 57069

Structure Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Custer, SD

ATY Terminal Site Improvements Watertown Regional Airport
Infrastructure
Post-Bid
Watertown, SD 57201

D & I Railroad Mainline and Crossing Improvements
New Construction, Alteration
Results
Brookings, SD

Outdoor Pool Earthwork
Infrastructure
Results
$1,114,745 est. value
Pierre, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

Ice Arena - Bid Pack No. 2
New Construction, Infrastructure
Construction
$787,000 CJ est. value
Watertown, SD 57201

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Net-Zero 1 Biofuel Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$980,000,000 CJ est. value
Lake Preston, SD 57249

Last Updated 10/04/2022 03:07 PM
Project Title

Water Storage Tank - City of Fort Pierre

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,760,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new above ground municipal water storage tank. As of October 4, 2022, this project is in the conceptual phase. The city is in negotiations to move forward into design. Information regarding a design firm have not been disclosed. Construction is estimated to take place in spring of 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents