Similar Projects
Last Updated | 09/29/2022 09:08 AM |
Project Title | Chinook Wind Mitigation Project |
Physical Address | View project details and contacts |
City, State (County) | Tukwila, WA 98168 (King County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2021 |
Bids Due | View project details and contacts |
Estimated Value | $4,054,055 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of July 2 2021, the project has been awarded to Scarsella Bros. Inc.- for $4,054,054.54. The start and the end date has not yet been determined. There is a 15% minimum Apprentice Utilization Requirement on this contract. There is a 15% minimum requirement for King County Certified Small Contractors and Suppliers (SCS) on this contract. Synopsis: The project consists of creating a wetland along the right bank of the Duwamish River and placement of large woody debris throughout the project area. Work includes installing and maintaining temporary erosion and sediment control measures; removing existing timber and concrete pilings remnant from a previously demolished motel; tree salvage; designing, installing, and maintaining temporary isolation systems for in-water work; excavation, haul and wetland grading; wetland soil amendment; topsoil placement; wood placement and anchoring; wetland sod mat placement; seeding; and goose exclusion system installation. The Contractor is required to prepare Stormwater Pollution Prevention and Isolation plans and execute the work in compliance with water quality requirements set by Washington State Department of Ecology and Washington Department of Fish and Wildlife as per the project permits. Site Tour: The Site Tour will last a maximum 30 minutes with a maximum of fifty (50) individuals. The following conditions apply to the physical Site Tour: 1. All participants must wear masks. No one will be allowed onto the Project Site without wearing a mask that covers the nose and mouth. No gators or bandanas will be allowed as face coverings. 2. No touching or handshakes. Individuals shall maintain a distance of six feet from each other throughout the Site Tour as much as practicable. 3. Avoid touching surfaces at the facility. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |