Similar Projects
West Duwamish CSO Storage
New Construction
Conception
$32,000,000 est. value
WA

Dutchman Construction
New Construction
Conception
$5,830,000 est. value
WA

21 Boston Mixed Use Development
New Construction - 273,000 SF
Design
Seattle, WA 98109

Central Maintenance Facility
New Construction
Design
$29,000,000 est. value
WA

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Central Maintenance Facility (Renton Shop)
New Construction
Results
$31,707,852 est. value
Renton, WA 98056

RFQ Engineering - Fort Dent Repairs Project
Infrastructure
Pending Verification
$692,119 CJ est. value
Issaquah, WA 98029

Willowmoor Construction
New Construction
Conception
$10,000,000 est. value
WA

Upcoming Projects O`Connell
Renovation
Design
$500,000 est. value
WA

South MATOC IDIQ On-Ramp
New Construction
Post-Bid
Less than $30,000,000 est. value

USPS IQ JOC Washington
New Construction, Renovation
Results
Less than $10,000,000 est. value

Old Jeffs Farm Revetment
New Construction
Conception
$2,900,000 est. value
WA

Stossel Long Term Project Construction
New Construction
Design
$2,600,000 est. value
WA

Last Updated 09/29/2022 09:08 AM
Project Title

Chinook Wind Mitigation Project

Physical Address View project details and contacts
City, State (County) Tukwila, WA 98168   (King County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $4,054,055 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 2 2021, the project has been awarded to Scarsella Bros. Inc.- for $4,054,054.54. The start and the end date has not yet been determined. There is a 15% minimum Apprentice Utilization Requirement on this contract. There is a 15% minimum requirement for King County Certified Small Contractors and Suppliers (SCS) on this contract. Synopsis: The project consists of creating a wetland along the right bank of the Duwamish River and placement of large woody debris throughout the project area. Work includes installing and maintaining temporary erosion and sediment control measures; removing existing timber and concrete pilings remnant from a previously demolished motel; tree salvage; designing, installing, and maintaining temporary isolation systems for in-water work; excavation, haul and wetland grading; wetland soil amendment; topsoil placement; wood placement and anchoring; wetland sod mat placement; seeding; and goose exclusion system installation. The Contractor is required to prepare Stormwater Pollution Prevention and Isolation plans and execute the work in compliance with water quality requirements set by Washington State Department of Ecology and Washington Department of Fish and Wildlife as per the project permits. Site Tour: The Site Tour will last a maximum 30 minutes with a maximum of fifty (50) individuals. The following conditions apply to the physical Site Tour: 1. All participants must wear masks. No one will be allowed onto the Project Site without wearing a mask that covers the nose and mouth. No gators or bandanas will be allowed as face coverings. 2. No touching or handshakes. Individuals shall maintain a distance of six feet from each other throughout the Site Tour as much as practicable. 3. Avoid touching surfaces at the facility.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents