Similar Projects
Northern Boulevard Expansion Phase II
Bidding
Rio Rancho, NM

Construction services for White Sands Village
Bidding
Pojoaque, NM

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Valle de Oro Outlet Structure
Post-Bid
$2,600,000 est. value
Albuquerque, NM 87107

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

Z--Installation of Continuous Channel Drain for Water
Results
$25,000 to $100,000 est. value
Kirtland, NM

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

City Wide Pond Maintenance
Results
Albuquerque, NM

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Vado West Floodplain Repair
Term Contract
Results
$1,000,000 to $5,000,000 est. value
NM

Non-Point Source Pollution Prevention Project for the Santa Clara Creek Watershed - 2020
Post-Bid
Espanola, NM 87532

Reported 02/23/2021 12:00 AM
Project Title

Dexter Demo & Construct 4 Concrete Pond Kettles

Physical Address View project details and contacts
City, State (County) Dexter, NM   (Chaves County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $265,000 to $275,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes: 1. Demolition of existing concrete pond kettle and constructing new concrete replacement kettle. 2. Earth work: Reshaping of pond side-slopes at kettle area to ensure a smooth and uniform pond slope and re-compaction of minimum of 12 inches beneath kettle. 3. New kettle shall be constructed at the given elevation of demolished structure to ensure that water does not “pond” at the pond liner/kittle attachments – See attached plans. B. Location: Work under this Contract is located approximately 25 miles southeast of Roswell, New Mexico, on the Southwestern Native Aquatic Resources & Recovery Center formerly known as Dexter National Fish Hatchery & Technology Center

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents