Similar Projects
Hwy 55 Burgers Shakes & Fries
New Construction
Conception
Zebulon, NC

Holland Road - Mixed Use Assembly
New Construction - 76,500 SF
Conception
Apex, NC 27502

301 West Cabarrus
Renovation - 22,855 SF
Design
$4,250,521 est. value
Raleigh, NC

Wallbrook Mixed Use
New Construction
Design
Rolesville, NC 27571

Sushi Thai
Renovation - 4,264 SF
Post-Bid
$300,000 est. value
Raleigh, NC 27607

Longfellow Discovery at Watkins
New Construction - 568,000 SF
Post-Bid
$10,000,000 CJ est. value
Morrisville, NC 27560

Bojangles
New Construction - 4,391 SF
Construction
$527,446 est. value
Raleigh, NC

Midtown Retail
New Construction - 5,100 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Raleigh, NC 27609

Holland Road Mixed-Use Development
New Construction - 76,500 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Apex, NC 27502

Beyu Caffe
Renovation - 900 SF
Pending Verification
Morrisville, Raleigh, NC 27560

Tryon Road - Mixed Use Development
New Construction
Conception
Raleigh, NC 27606

Hammell Drive Mixed-Use
New Construction - 12,000 SF
Design
$600,000,000 est. value
Raleigh, NC 27603

Starbucks
Build-Out - 2,715 SF
Post-Bid
Garner, NC 27529

Starbucks
Renovation - 699 SF
Construction
$125,000 est. value
Morrisville, NC 27560

Fenton - Mixed-Use Development
New Construction - 508,400 SF
Pending Verification
$10,000,000 CJ est. value
Cary, NC 27511

Reported 07/14/2022 09:51 AM
Project Title

The Village Tavern / Raleigh

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27609   (Wake County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected August 2024
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a restaurant in Raleigh, North Carolina. Conceptual plans call for the renovation of a 7,500-square-foot, one-story above grade restaurant. The project scope includes a tenant build out with a 2,500-square-foot patio in the Main District of the North Hills development. As of July 13, 2022 the project is in planning stage. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the later half of 2024* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, 1 Story Above Grade, 7,500 SF Build-Out.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents