Similar Projects
Green Bay Water Utility Dredging of Sludge Lagoon Number. 1
Infrastructure
Bidding
$60,000 est. value
Green Bay, WI

Maintenance Dredging and Culvert Replacement
Infrastructure
Post-Bid
$700,000 est. value
Columbus, WI

Everglade Road Dredging - Phase 3
Infrastructure
Post-Bid
$180,000 est. value
Greenville, WI 54942

FY21 Dredging Sources Sought
Results
$1,000,000 to $5,000,000 est. value
Detroit, Saginaw, MI - Superior, WI

Yahara River Flow Enhancement - Phase 2
Infrastructure
Results
WI

Eau Claire River Dredging
Results
$50,000 est. value
Eau Claire, WI

Greenville Everglade Road Dredging
Infrastructure
Results
Greenville, WI 54942

City Pond Dredging
Infrastructure
Post-Bid
$150,000 est. value
Brookfield, WI

Cravath and Tripp Lake Dredging
Infrastructure
Results
Whitewater, WI

Grassed Waterway System & Wetland Restoration
New Construction, Renovation
Results
Allenton, WI

Green Bay Harbor Dredging, Green Bay, Wisconsin, (Usace-Chicago District Project)
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Green Bay, WI

Sturgeon Bay Dredging
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Sturgeon Bay, WI 54235

Streambank Stabilization System
Renovation
Results
Richfield, WI

Camelot Pond Dredging
Infrastructure
Bidding
$700,000 est. value
Brookfield, WI

Last Updated 06/27/2022 07:23 AM
Project Title

Holz Parkway and Miniwauken Pond Dredging

Physical Address View project details and contacts
City, State (County) Mukwonago, WI 53149   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $366,300 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the excavation/dredging, stockpiling, and grading of approximately 1,310 cubic yards of sediment from three existing ponds. Includes erosion and sediment control measures, traffic control, all setup, operation and continuous maintenance of a temporary dewatering system for the ponds, restoration of disturbed areas and miscellaneous appurtenances required to complete construction.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents