Similar Projects
Biloxi Visitors Center Repairs - Phases 2 and 3
Renovation
Bidding
$300,000 est. value
Biloxi, MS 39530

Lauderdale County Public Safety Building
New Construction
Post-Bid
Lauderdale, MS

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

Phase II Renovations to Downtown Innovation Hub
Renovation
Results
Starkville, MS

Bathhouse Renovation Services
Renovation
Results
Grenada, MS 38902

Bathhouse Renovations at Lake Lowndes State Park
Renovation
Post-Bid
Columbus, MS 39702

Building and Truck Loading Yard Improvements
Results
New Albany, MS

South Carolina Construction IDIQ
New Construction, Renovation, Addition
Post-Bid
$250,000 to $3,000,000 est. value

MS Phosphate Phase 1C Construction
New Construction
Results
$10,000,000 est. value
Jackson, Pascagoula, MS 39209

Professional Design Services - Head Start Center
New Construction
Post-Bid
Less than $4,000,000 est. value
Mississippi State, MS

Delta Work Center Flood Repairs
Renovation
Results
$100,000 to $250,000 est. value
Rolling Fork, MS

Addition to DOIM Building at USPFO
Addition
Post-Bid
Flowood, MS 39232

Lauderdale County Health Department WIC Renovation
Renovation
Post-Bid
Meridian, MS 39307

2019 Water System Improvements Contract IV - Shop
New Construction
Post-Bid
MS

Stennis Space Center Zone 8 Modifications
New Construction, Renovation
Post-Bid
MS

Last Updated 11/08/2021 01:58 PM
Project Title

De Soto and Chickasawhay Ranger District Building Upgrades/Renovations

Physical Address View project details and contacts
City, State (County) Laurel, MS   (Jones County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description and Location: Contractor shall provide all materials and labor necessary to provide building upgrades/renovations at some of the Administrative Sites as well as stabilize the spud poles that are part of the floating fishing pier at the Turkey Fork Lake Day Use Area.

Details

Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents