Similar Projects
Whirlpool Road Dirt Road Paving Driveway Pipe
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Crockett Street Drainage Improvements Phase II
Results
Less than $280,000 est. value
FL

Blue Springs Drainage Improvements at Crescent Lake
Results
Less than $373,000 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Scott, Yates, Lakeview, and Strong Outfalls at Bayou Texar
Results
Pensacola, FL

Sharp Point Beach Nourishment Project
Results
Pensacola, FL

Alcaniz Street Outfall to Pensacola Bay Stormwater Treatment Enhancement
Results
Pensacola, FL 32502

Stormwater Ponds Maintenance
Results
Pensacola, FL 32502

Clerk Archives Flood Mitigation Project
Results
Pensacola, FL 32501

Bayou Boulevard, Lee, Lloyd and Stanley Street Outfalls to Bayou Texar Stormwater Treatment Enhancement
Results
Pensacola, FL

Klondike Road at Cedarbrook Estates Pond
Results
Pensacola, FL 32526

Fairchild Street Swale Upgrade Project
Results
Less than $122,000 est. value
Pensacola, FL 32504

Pensacola Bay Living Shoreline Greenshores II
Results
Pensacola, FL 32502

Burgess Road Sidewalk & Drainage Improvements
Results
Less than $1,570,000 est. value
Pensacola, FL 32598

Last Updated 09/21/2021 12:16 AM
Project Title

Cross Street and Martin Luther King Junior Drive to 9th Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32598   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of seven (7) valley gutters, a minimum of 16 feet in width and 6 inches thick. Bid alternate portion includes enlarging six (6) Type A-1 curb inlets to Double Type-A1, and one (1) Type-A curb inlet to Double Type-A. Inlet tops should be increased in size while inlet bottom structures remain as is. Inlet top shall be fitted with City Standard 34" ring and cover. Efforts associated with project include, but are not limited to, removal of asphalt and concrete, maintenance of traffic, excavation, removal/replacement of existing landscaping, site grading, installation of form work, concrete work, and sodding.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents