Similar Projects
Minooka Road Regional Lift Station and Force Main - Village of Minooka
Infrastructure
Conception
$450,000 CJ est. value
Minooka, IL 60447

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Coal City Area Club - Drainage Improvements
Infrastructure
Bidding
$660,000 CJ est. value
Coal City, IL 60416

Coal City Area Club - Drainage Improvements
Infrastructure
Bidding
$660,000 CJ est. value
Coal City, IL 60416

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

0.7 MI of Mcclindon Rd in Channahon to 0.2 Mi W of Will Co Line
Infrastructure
Post-Bid
IL

Engineering Services for Will Road Reconstruction - Phase II and Phase III
Infrastructure
Results
Diamond, IL 60416

Intersections of IL 47 and Pine Bluff Road and at the Intersection of IL 47 and Southmor Road South of Morris
Infrastructure
Results
IL

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Resurfacing the Asphalt Parking Lot at Our Existing Fire Station #2
Infrastructure
Bidding
Morris, IL 60450

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Parking Lot Improvements
Infrastructure
Results
$270,000 est. value
Gardner, IL 60424

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

Last Updated 08/11/2023 11:34 PM
Project Title

Pavement Widening With Resurfacing of Morey Road and Seneca Road

Physical Address View project details and contacts
City, State (County) Erienna Township, IL 60450   (Grundy County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $375,288 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement widening with resurfacing of Morey Road and Seneca Road including minor drainage improvements. Region 2 District 3 Federal Project # N/A County(s) Grundy Key Route(s) TR 39 TR 26 Marked Route(s) Morey Road & Seneca Road Section(s) (TR 39 & TR 26)RS&W State Job #(s) C-93-056-23 PPS #(s) 3-70039-0000 Completion Date: September 30, 2023 Plus 15 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 028 - Pavement Widening With Resurfacing of Morey Road and Seneca Road

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents