Similar Projects
2021-2022 Courthouse Alley Drainage Project
Infrastructure
Bidding
Ridgway, CO

Rocky Ford SWA-Irrigation Pipeline
Infrastructure
Bidding
Colorado Springs, CO

Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

2" Flexible Conduit
Post-Bid
Fort Collins, CO 80521

Culvert Replacement Various Locations
Results
$1,000,000 to $5,000,000 est. value

Culvert Replacement Various Locations
Results
$1,000,000 to $5,000,000 est. value

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Bidding
Loveland, CO

64th Avenue Reinforced Concrete Box Culvert Fabrication
Post-Bid
Denver, CO

2020 Heeney Road Embankment Repair
Results
Frisco, CO 80443

Oxford at River Run Trail Connection
Infrastructure
Bidding
Englewood, CO 80110

2020 Still Water Ditch Improvements project
Post-Bid
Steamboat Springs, CO 80477

US 24, M.P. 288.74, will Clean Culvert and Box Culvert and Repair Joint between the Cmp and Cbc, and Will Add Turf Reinforcement Mat and Rock Check Dams Near Inlet to Help Prevent Erosion
Results
Less than $1,000,000 est. value
CO

Crystal River Embankment Stabilization Project
Infrastructure
Bidding
CO

Root & Ratliff Salinity Control Pipeline Project
Post-Bid
$2,350,000 to $2,850,000 est. value
Mancos, CO

Clean Culvert, Remove Existing Headwall, Spray Line Culvert, and Repair Crack in Headwall at Outlet
Results
Less than $1,000,000 est. value

Last Updated 12/10/2021 09:33 AM
Project Title

3-Sided Precast Concrete Box Culvert

Physical Address View project details and contacts
City, State (County) Montrose, CO   (Montrose County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish a 3-sided precast concrete box culvert. This structure is intended for installation in an irrigation canal at an elevation of 5700 feet. The bridge replacement project is scheduled to be completed by County crews during the winter of 2021-2022 when there are no irrigation flows. Site preparation will take several weeks after the end of the irrigation season, which typically ends in November. Irrigation season begins late March.

Details

Division 02 - Existing Conditions.
Division 33 - Utilities, Culverts.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents