Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 est. value
Tacoma, WA 98417

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
Tacoma, WA 98418

Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Foothills Trail - East Puyallup Trail Head Expansion - 3240 - Pierce County
Infrastructure
Design
Tacoma, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Bidding
$210,000 est. value

Bonney Lake 950 Zone Tank and 950 / 1010 Zone Pump Station
New Construction, Infrastructure
Bidding
$8,900,000 CJ est. value
Tacoma, WA 98405

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

West Side of Phillips Rd SW Sidewalk
Infrastructure
Post-Bid
Lakewood, WA

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,849,000,000 est. value
Tacoma, WA 98405

208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
New Construction, Infrastructure
Design
$26,186,000 est. value
Tacoma, WA 98417

Potable Water Line Replacement - Clover Park Technical College
Infrastructure
Bidding
$865,000 CJ est. value
Lakewood, WA 98499

I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements
Infrastructure
Post-Bid
$165,000,000 to $195,000,000 est. value
Fife, WA 98424

Last Updated 07/28/2022 12:41 AM
Project Title

Madison District Green Infrastructure Project

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98405   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $11,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope: The Madison District Green Infrastructure project is replacing approximately 18 blocks of residential roadways between South 43rd Street and South 47th Street and between South Tacoma Way and Pine Street with approximately two standard asphalt blocks and approximately 15 pervious asphalt blocks with ballasted sidewalk. Work also includes replacing 3400LF of Wastewater, replacing or extending 1300LF of Surface Water pipe, and replacing 6400LF and removing 2000LF of Water pipe. Driveways, curb ramps, street trees, and channelization are included as well. Paid Sick Leave: The City of Tacoma requires all employers to provide paid sick leave as set forth in Title 18 of the Tacoma Municipal Code. For more information, visit our Minimum Employment Standards Paid Sick Leave webpage. Americans with Disabilities Act (ADA Information: The City of Tacoma, in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. Specification materials can be made available in an alternate format by emailing Gail Himes at ghimes@cityoftacoma.org, or by calling her collect at 253-591-5785. Title VI Information: "The City of Tacoma" in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration of award. Additional Information: Requests for information regarding the specifications may be obtained by contacting Dawn DeJarlais, Senior Buyer by email to ddejarlais@cityoftacoma.org Estimate: $10.5 Million to $11.5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No. Surface Water - ENV-03031-25 Wastewater - ENV-04023-18 Public Works - PWK-00438-18 Water - WTR-00604-01-13

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents