Similar Projects
Intersection Improvement-SC 187/Whitehall Rd Ext
Bidding
Anderson, SC 29621

Reconstruction/Rehabilitation - District 2
Bidding

Asphalt - West Market School of Early Learning
Post-Bid
Anderson, SC 29626

Seal Coating
Post-Bid
$50,000 to $100,000 est. value
Abbeville, SC 29620

Clemson Grove Road Improvements
Results
$400,000 to $600,000 est. value
Pendleton, SC

Intersection Improvements - US 29
Results
SC

Seal and Striping at Multiple Sites
Bidding
Anderson, SC

Asphalt Projects
Post-Bid
Anderson, SC 29621

Preservation - District 2
Results

Asphalt Re-Striping and Resealing - CF Reames, McCants and Centerville
Term Contract
Post-Bid
Anderson, SC 29621

Reconstruction - Abbeville County
Results
SC

Transportation Improvements
Post-Bid
Anderson, SC 29625

Reconstruction - Anderson County
Results
SC

Road Resurfacing and Maintenance
Post-Bid
Easley, SC

Reconstruction/Rehabilitation -Anderson County
Results
SC

Last Updated 11/11/2020 10:13 PM
Project Title

Reconstruction/Rehabilitation - District 2

Physical Address View project details and contacts
City, State (County) (Abbeville, Anderson Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 7.000 Ea Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 375.000 Sy Borrow Excavation 9,648.800 Cy Excavation For Shoulder Paving 178.000 Sta Hauling Of Excavated Shoulder Material 178.000 Sta Cement Modified Recycled Base (8" Unif)-Curing Method b 52,610.000 Sy Cement Modified Recycled Base (10" Unif)-Curing Method b 90,102.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 124,862.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method c 40,635.000 Sy Portland Cement For Cement Modified Recycled Base Course 12,299.000 Ton Maintenance Stone 102.350 Ton Hma Shoulder Widening Course 588.192 Ton Liquid Asphalt Binder Pg64-22 3,328.572 Ton Full Depth Asph. Pav. Patching 4" Unif. 1,200.000 Sy Full Depth Asph. Pav. Patching 6" Unif. 4,300.000 Sy Full Depth Asph. Pav. Patching 8" Unif 4,705.000 Sy Full Depth Asph. Pav. Patching 12"Unif 30.000 Sy Milling Existing Asphalt Pavement 1.5" 3,400.000 Sy Milling Existing Asphalt Pavement 1.75" 16,290.000 Sy Milling Existing Asphalt Pavement 4.0" 37,115.000 Sy Milling Existing Asphalt Pavement (Variable) 17,540.000 Sy Milled-In Rumble Strip 36.348 Mi Hot Mix Asphalt Intermediate Course Type b 4,383.104 Ton Hot Mix Asphalt Intermediate Course Type c 14,453.296 Ton Hot Mix Asphalt Surface Course Type b 13,310.176 Ton Hot Mix Asphalt Surface Course Type c 26,511.296 Ton Hot Mix Asphalt Surface Course Type d 150.000 Ton Driveway Paving-Surface Type b 492.191 Ton Driveway Paving-Surface Type c 836.814 Ton Permanent Construction Signs (Ground Mounted) 5,972.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 4,468.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 841,590.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,490.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,999.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 34.000 Ea White Word Message "Only"-Fast Dry Paint 6.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 45,150.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 891,600.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,330.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 263,962.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 480.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 1,756.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 9.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 14,610.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 288,139.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 21.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,764.000 Ea Pref.Flex.Retro.Pvmt.Mark(t-1)Perm.(60mil)4"Yel.Sol. 600.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 136.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 2,920.000 Lf Sawcut For Loop Detector 920.000 Lf 13"x24"x12"d.Elec.Flush Undgrd.Enclosure-(Str.Poly.Conc.)Hd 4.000 Ea Catch Basin - Type 9(Top Only) 2.000 Ea Detectable Warning Material 187.500 Sf Pedestrian Ramp Construction 375.000 Sy Remove & Dispose Semi-Rigid Gr Device 4,725.000 Lf Premash w-Beam Strong Post System Wsp3 825.000 Lf Mt3 Leading End Treatment Tl3 20.000 Ea Premash Reset w-Beam Strong Post System 3,412.500 Lf Mgs3 Gr Standard Shoulder 200.000 Lf Mgs3cs Gr Compressed Shoulder 2,612.500 Lf Premash w-Beam Compressed Shldr 9` Post 950.000 Lf Premash Type t Tl3 Leading 50` 58.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 22.873 Acre Sediment Tubes For Ditch Checks 310.000 Lf Silt Fence 10,485.000 Lf Replace/Repair Silt Fence 1,050.000 Lf Removal Of Silt Retained By Silt Fence 2,625.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents