Similar Projects
East Lee Middle School New Gym and Renovations - Lee County
New Construction, Renovation, Infrastructure
Conception
$5,460,000 CJ est. value
Sanford, NC 27332

Lee County New Elementary School- Lee County
New Construction, Infrastructure
Conception
$32,800,000 CJ est. value
Sanford, NC 27330

Deep River East Subdivision
New Construction, Infrastructure
Design
$220,000,000 CJ est. value
Sanford, NC 27330

Deep River East Subdivision
New Construction, Infrastructure
Design
$220,000,000 CJ est. value
Sanford, NC 27330

S. Main Street Sidewalk Improvements
Infrastructure
Bidding
$235,000 CJ est. value
Broadway, NC 27330

S. Main Street Sidewalk Improvements
Infrastructure
Bidding
$235,000 CJ est. value
Broadway, NC 27330

RFQ Contractor - Multi-Sports Complex
New Construction, Infrastructure
Post-Bid
$18,400,000 CJ est. value
Sanford, NC 27330

RFQ Contractor - Multi-Sports Complex
New Construction, Infrastructure
Post-Bid
$18,400,000 CJ est. value
Sanford, NC 27330

Milling and Resurfacing
Infrastructure
Results
NC

2021 - 2022 Street Resurfacing and Rehabilitation
Infrastructure
Results
Sanford, NC

Sanford Industrial Park
New Construction, Infrastructure
Pending Verification
$116,200,000 CJ est. value
Sanford, NC 27330

Sanford Industrial Park
New Construction, Infrastructure
Pending Verification
$116,200,000 CJ est. value
Sanford, NC 27330

West Lee Middle School New Gym and Renovations - Lee County
Addition, Renovation, Infrastructure
Conception
$5,460,000 CJ est. value
Sanford, NC 27330

The West Preserve
New Construction, Infrastructure
Design
$25,900,000 CJ est. value
Sanford, NC 27332

Grading, Drainage, Paving & Signals -NC 87
Infrastructure
Bidding
$1,500,000 CJ est. value
Sanford, NC 27330

Last Updated 06/30/2023 10:13 AM
Project Title

Swartz Subdivision

Physical Address View project details and contacts
City, State (County) Sanford, NC 27330   (Lee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $39,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on 33.6 acres at 3417 Wicker Street, 105 South Franklin Drive and 125 South Franklin Drive. Scope details have not been released. As of June 30, 2023 the project has received rezoning and preliminary plat approval from the City of Sanford. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction. 2 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents