Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

AutoZone #5607 / Gluckstadt
New Construction, Infrastructure - 7,000 SF
Bidding
$1,500,000 CJ est. value
Madison, MS 39110

Water System Improvements
Infrastructure
Bidding
$700,386 CJ est. value
Newhebron, MS 39140

Chipotle #22006 / Madison
New Construction, Infrastructure - 2,325 SF
Sub-Bidding
$700,000 CJ est. value
Madison, MS 39110

Resurrection Life Church / Picayunne
New Construction, Infrastructure - 52,448 SF
Sub-Bidding
$25,000,000 CJ est. value
Picayune, MS 39466

Industrial Site Development and Access Road Improvements
Infrastructure
Results
$329,003 CJ est. value
Ripley, MS 38663

County Road Micro-Surfacing Project
Infrastructure
Results
$270,711 CJ est. value
Waynesboro, MS 39367

2021 Wastewater Improvements
Renovation, Infrastructure
Construction
$338,600 CJ est. value
Hickory, MS 39332

East Mississippi Community College Baseball Field Turf Installation Scooba Campus
Infrastructure
Construction
$1,591,479 CJ est. value
Scooba, MS 39358

Oneline Transportation Corridor Development - City of Jackson
Infrastructure
Conception
$10,000,000 CJ est. value
Jackson, MS 39217

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Mill and Overlay - SR 32
Infrastructure
Bidding
$10,000,000 CJ est. value
Water Valley, MS 38965

Last Updated 11/01/2022 02:08 AM
Project Title

RFQ Engineering - Black Creek Cooling Water Facility MDEQ Rehabilitation of High Hazard Potential Dams Engineering Services

Physical Address View project details and contacts
City, State (County) Moss Point, MS 39563   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Black Creek Cooling Water Facility MDEQ Rehabilitation of High Hazard Potential Dams Engineering Services The engineering services are to be provided in response to dam safety requirements to evaluate the adequacy of the existing dam spillway at the Black Creek Cooling Water Facility reservoir in Jackson County, Mississippi. The selected Engineer shall provide a Probable Maximum Flood (PMF) analysis of the Black Creek Cooling Water Facility dam and reservoir; an Incremental Hazard Evaluation to evaluate the incremental increase in consequences due to a potential dam failure; and complete a formal report of findings of the evaluations which will include recommendations for sizing of a new spillway structure, if applicable. For any questions relating to using Central Bidding, please call 225-810-4814. Any contract awarded under this solicitation may be paid for in whole or in part with grant funding from the Mississippi Department of Environmental Quality. The project is being funded partly through the Department of Homeland Security Fiscal Year 2019 High Hazard Potential Dams Rehabilitation Grand, CFDA 97.041- National Dam Safety Program, awarded on September 9,2019, and formally amended on January 15, 2020. If you have any questions concerning the Request for Qualifications, please call the Jackson County Port Authority, Purchasing Department, during working hours listed above, at 228-762-4041. The method of Contractor Selection has not been Determined at this time

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents