Similar Projects
Murphy USA #6608 / Stillwater
Demolition, New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Stillwater, OK 74074

Grade, Drain, and Surface - US 177
Infrastructure
Design
$5,088,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 51
Infrastructure
Design
$1,000,000 CJ est. value
Stillwater, OK 74074

Dutch Bros / Stillwater
New Construction, Infrastructure - 950 SF
Bidding
$500,000 CJ est. value
Stillwater, OK 74074

OSU New Central Market Place - Select Trades Rebid
New Construction, Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Stillwater, OK 74074

Parking Lot Repair Sealing and Striping Yale Junior High and Avoca Elementary School
Infrastructure
Post-Bid
$90,000 est. value
Yale, OK 74085

Asphalt Overlay
Infrastructure
Post-Bid
$2,679,278 CJ est. value
Stillwater, OK 74074

Stillwater Community Center Exterior Ramp and Canopy
Renovation, Infrastructure
Results
Stillwater, OK 74074

Overlay of a Area With 2 Manhole Rings to Bring the Manholes Level With the Street
Infrastructure
Results
$40,900 CJ est. value
Glencoe, OK 74032

Teal Ridge Estates Second Section
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Stillwater, OK 74074

Utilities - SH 18
Infrastructure
Design
$500,000 CJ est. value
Yale, OK 74085

South Thompson Avenue, Culvert Replacement Over Cottonwood Creek
Infrastructure
Post-Bid
$300,000 CJ est. value
Cushing, OK 74023

Widen and Resurface - SH 18
Infrastructure
Results
$9,642,525 CJ est. value
Cushing, OK 74023

Widen and Resurface - SH 51
Infrastructure
Design
$17,510,000 CJ est. value
Stillwater, OK 74074

Club Car Wash / Stillwater
New Construction, Infrastructure - 5,671 SF
Post-Bid
$1,300,000 CJ est. value
Stillwater, OK 74075

Last Updated 02/07/2023 03:38 PM
Project Title

SPS High School Parking Lot Lighting Improvements

Physical Address View project details and contacts
City, State (County) Stillwater, OK 74075   (Payne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $143,490 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of parking lot light fixture replacement, stadium concourse lighting upgrade, and stadium exterior lighting replacement. Stillwater Public Schools reserves the right to reject any or all bids or to waive any formalities or irregularities in any bid, and to accept the bid or bids which seem most advantageous to the Stillwater Public Schools. The last date for receipt of substitution requests and RFI's is Wednesday, December 19th, 2022 at noon. Contact Rob Lamecker, SPS Director of Facilities Management at (405) 338-1048 to coordinate visit to the site.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents