Similar Projects
Lift Station V-03 Replacement
Renovation
Bidding
$1,690,000 est. value
Merritt Island, FL 32952

Suntree Booster Station Rehabilitation
Renovation
Bidding
$1,690,000 est. value
Melbourne, FL 32940

Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Post-Bid
Sebastian, FL

Lift Stations C07 and C11 Rehabilitation
Results
Merritt Island, FL 32953

Lift Stations J06 and V13 Rehabilitation
Results
Merritt Island, FL 32952

Lift Station S-26 Replacement
New Construction
Bidding
Satellite Beach, FL

Lift Stations T-36 and T-69 Rehabilitation
Results
Melbourne, FL 32940

Lift Station M-16 Replacement
New Construction
Bidding
FL

Lift Station No. 38
New Construction
Results
$98,819 est. value
Melbourne, FL 32901

West Cocoa Wastewater Improvements Phase 1
Results
$3,164,000 est. value
Melbourne, FL 32940

Submersible Pumps and Wastewater Lift Stations
New Construction
Results
Cocoa, FL 32922

Lift Station T-27 Rehabilitation
Results
Melbourne, FL 32940

Lift Station S-14 Upgrade
New Construction
Results
$100,000 est. value
Indian Harbour Beach, FL 32937

Lift Station No. 8 Rehabilitation
New Construction
Results
$286,170 est. value
Cape Canaveral, FL 32920

Water Inflated Cofferdam - Unit 2 Pump Station
New Construction
Results
$80,000 est. value
Palm Bay, FL

Reported 01/26/2022 01:37 PM
Project Title

Lift Station S-19 Replacement

Physical Address View project details and contacts
City, State (County) Melbourne Beach, FL 32951   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Permitting, Construction Start Expected February 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,385,422
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of Lift Station S-19, located on Satellite Beach, including conversion of the existing wet well into a manhole; installation of a new 8’ diameter pump station to support two submersible pumps; installation of 6” force main from discharge valve station to existing force main; installation of new 8” gravity sewer main and sewer manhole; extension of 24” RCP drainage piping and structures including storm manhole and inlet; repair of disturbed asphalt roadway; installation, maintenance, and removal of the temporary bypass to facilitate the lift station modifications

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents