Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Well Installation
Infrastructure
Bidding
Urbana, IL

Well 7 and 13 Interconnect Project
Infrastructure
Bidding
Saint Charles, Valley View, IL 60174

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Deep Wells 3A and 5A Upgrades
Results
Elgin, IL 60120

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Roosevelt HS Ejector Pumps Replacement
Results
Chicago, IL 60625

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Deep Well 2 Repairs
Results
Elgin, IL 60120

Last Updated 12/07/2021 02:03 PM
Project Title

Raw Water Well

Physical Address View project details and contacts
City, State (County) Eddyville, IL   (Pope County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $208,870
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a new raw water well and other necessary appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents