Similar Projects
Speedway #8832
New Construction - 4,600 SF
Conception
Rochester Hills, MI 48307

Shell Gas Station
Renovation, Addition
Conception
Troy, MI 48085

Kroger #520-02
New Construction
Design
Ypsilanti, MI 48198

Tim Hortons
New Construction, Demolition
Design
Farmington Hills, MI 48336

Valvoline Instant Oil Change
New Construction - 3,776 SF
Sub-Bidding
$500,000 to $1,000,000 CJ est. value
Bloomfield Township, MI 48302

Sam's Club #6664-221 - GS
Renovation
Post-Bid
Utica, MI 48315

Christian Brothers Automotive Service Center
New Construction - 5,875 SF
Post-Bid
Grand Rapids, MI 49525

SAR; Frmr Wesson Filling Station - Remedial Invest
Renovation
Results
Detroit, MI

DPS Vactor Pad and Washbay Project
Renovation
Results
Rochester Hills, MI

Envy Auto Group
Renovation
Construction
Saint Clair Shores, MI 48080

Adell Center
New Construction
Construction
$125,000,000 est. value
Novi, MI 48375

Shell Gas Station Expansion
Renovation, Addition
Pending Verification
Livonia, MI 48152

Insite Logistics Facility - Project Viper
New Construction - 138,435 SF
Pending Verification
$10,000,000 CJ est. value
Romulus, MI 48174

Green Mitt Car Wash
New Construction - 4,983 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Traverse City, MI 49686

AGO Gas Station & Convenience Store
New Construction - 4,860 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walker, MI 49534

Reported 08/20/2021 12:00 AM
Project Title

R & L Carriers Detroit Terminal Expansion & Renovation

Physical Address View project details and contacts
City, State (County) Ypsilanti, MI 48198   (Washtenaw County)
Category(s) Commercial, Industrial/Manufacturing, Transportation
Sub-Category(s) Car Wash, Freight Terminal, Gas Station, Industrial Warehouse, Vehicle Sales/Service
Contracting Method Bids by Invitation.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK CONSISTS OF: 1. A new 45,900 square foot building addition to the end of the existing terminal facility 2. A 10,000 square foot renovation of the existing building 200 facility. 3. A new 24,000 square foot Truck Maintenance Facility 4. A new 5500 square foot Truck Wash Facility 5. A new 6 bay Fuel Island including underground storage tanks. 6. Construction of a private drive (Minion Rd) to Township Standards. 7. A new Sound Wall at the site perimeter near the south and east boundary. 8. Miscellaneous site demolition and construction work to facilitate the expansion of the facility.

Details

Car Wash, 5,500 SF New Construction, Gas Station, New Construction, 6 Fuel Pump(s), Freight Terminal, 45,900 SF Addition, Industrial Warehouse, 10,000 SF Renovation, Vehicle Sales/Service, 24,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents