Similar Projects
Security Center Complex
New Construction, Renovation
Conception
Spanish Fork, UT 84660

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

DFCM Construction-Standard Low Bid-DWR Fountain Green Fish Hatchery Power Plant Demolition
New Construction, Demolition
Bidding
$184,000 est. value
Alpine, UT

New Washington County Administration Building
New Construction - 141,702 SF
Post-Bid
Less than $15,000,000 est. value
Saint George, UT

Provo WATRR Center Phase 1 Project
Post-Bid
Provo, UT 84606

Z--Simplified Acquisition of Basic Engineering Requirements (SABER)
Results
$10,000 to $40,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

New SUVSWD Environmental Recovery Facility
New Construction
Construction
Spanish Fork, UT 84660

DFCM- Civil, Mechanical, and Electrical Engineering Buildings
New Construction
Design
Orem, UT 84058

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

D/B Western MATOC
Results
$1,000,000 to $70,000,000 est. value

Spanish Fork Community Network Facility Construction
New Construction
Design
$8,000,000 est. value
Spanish Fork, UT 84660

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Access Control Point Program Design Build II -- RFI(2)
Results

Reported 03/04/2022 12:00 AM
Project Title

Prequalification for Construction of CIPs for Timpanogos Special Service District

Physical Address View project details and contacts
City, State (County) American Fork, UT   (Utah County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $15,000,000 to $18,000,000
Plans Available from Municipal Agency - 02/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

The general contractors for construction of CIPs in the collection system for Timpanogos Special Service District.

Details

Misc. Buildings, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents