Similar Projects
The Village at Loretto Heights
New Construction, Renovation
Conception
Denver, CO 80236

RidgeGate - Master Planning
New Construction - 1,200,000 SF
Conception
$10,000,000 CJ est. value
Lone Tree, CO 80124

5505 Central Offices
New Construction - 56,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Boulder, CO 80301

Innosphere Phase 2
New Construction - 7,300 SF
Design
$1,000,000 est. value
Fort Collins, CO 80524

Swansea Recreation Center Indoor Pool CM and GC
Renovation, Addition
Bidding
$15,000,000 est. value
Denver, CO 80216

Peoria Crossing II
New Construction - 89,770 SF
Bidding
Aurora, CO 80010

1740 at The Atrium
Renovation - 113,083 SF
Sub-Bidding
$8,479,558 est. value
Denver, CO 80274

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Office Remodel Project
Renovation
Post-Bid
Ignacio, CO 81137

Y--Co-San Luis Valley Complex Hq Ofc Bldg
Results
$1,000,000 to $5,000,000 est. value
Alamosa, CO 81101

Berthoud Campus Expansion Project Phase I
Results
Less than $19,000,000 est. value
Berthoud, CO 80513

Mackintosh Academy
Addition - 4,200 SF
Construction
Littleton, CO 80120

Breeze Thru Headquarters
Renovation - 16,000 SF
Construction
$1,000,000 est. value
Fort Collins, CO 80521

Noco RV Rentals
New Construction
Pending Verification
$2,000,000 est. value
Fort Collins, CO 80524

Former El Charrito Property Redevelopment
Renovation
Pending Verification
$3,000,000 est. value
Denver, CO 80205

Reported 02/01/2022 12:00 AM
Project Title

Apex Simms Street Office Remodel Phase I

Physical Address View project details and contacts
City, State (County) Arvada, CO 80005   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing counter, wall mounted computer desk (identified in supplemental drawing), small section of wall, move electrical receptacles and other electrical out of wall to be demolished. Install class wall with door as indicated on attached drawing. Repair carpet. Repair and replace drywall as needed from demolition. Replace light fixtures with LED light fixtures.

Details

Office, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents