Similar Projects
HVAC Replacements for Frisco Athletic Center
Alteration
Bidding
Frisco, TX 75035

HVAC Filters
Term Contract
Bidding
Plano, TX

Haggard and Hendrick Middle Schools Cooling Tower Replacement
Post-Bid
Less than $300,000 est. value
Plano, TX 75025

Frisco ISD - Summer 2021 - HVAC
Post-Bid
Less than $2,000,000 est. value
Frisco, TX

City Hall Server Room HVAC Replacement
Results
Allen, TX 75013

HVAC Replacement/Upgrade
Term Contract
Results
$276,476 est. value
Plano, TX 75093

HVAC and Mechanical Products
Term Contract
Post-Bid

Plano Senior Center VAV Replacement
Results
Less than $80,000 est. value
Plano, TX 75075

Operations Building at Main Lane Plaza 7 HVAC Upgrades
Post-Bid
$100,000 to $200,000 est. value
Plano, TX 75075

Controls Replacement, 900 & 920 Park Blvd Buildings
Results
$109,967 est. value
Plano, TX 75074

HVAC Equipment Removal and Installation Only
Post-Bid
Anna, TX

HVAC System for CCHCS
Results
$20,000 est. value
McKinney, TX 75071

Roofing/HVAC Removal and Installation
Post-Bid
Anna, TX

Myers Park, The Landing HVAC Replacement
Results
$14,778 est. value
McKinney, TX 75071

Exhaust Hood & Duct Cleaning - 2 Month Service
Post-Bid
San Antonio, TX 78275

Last Updated 12/30/2021 04:09 PM
Project Title

Plano Event Center HVAC Replacement Project

Physical Address View project details and contacts
City, State (County) Plano, TX   (Collin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of eleven (11) existing self-contained water cooled heat pump air handling equipment, three (3) water source heat pumps, and sixteen (16) roof mounted exhaust fans and the replacement of eleven (11) existing self-contained water cooled heat pump air handling equipment, three (3) water source heat pumps, and sixteen (16) roof mounted exhaust fans. The scope includes electrical, controls, ductwork, piping, and some general construction to repair back to existing conditions where walls are removed to provide access for the new installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents