Similar Projects
Pearland Surface Water Plant
Post-Bid
Less than $100,000,000 est. value
Pearland, TX 77853

AMIS Rehab Water System
Post-Bid
$1,000,000 to $1,500,000 est. value
San Antonio, TX

Aircraft Hangar Hydraulic Pump System Repair and Service
Results
San Antonio, TX 78236

Pump Evaluation, Maintenance and Repairs
Term Contract
Results
$250,000 est. value
Wylie, TX 75098

Water Plant Nos. 1 and 2
Results
$1,000,000 est. value
Caldwell, TX 77836

Water Well No. 1 Rehabilitation
Results
$175,000 est. value
TX

Water Supply Plant No. 2 to Serve Brazoria County
New Construction
Results
TX

Water Treatment Services
Results
$20,000 est. value

Influent Pump SWWTP
Infrastructure
Results
$72,000 est. value
Killeen, TX

Last Updated 02/21/2022 06:38 AM
Project Title

Hickory Groundwater Supply System Expansion - Contract 2 - Treatment Plant Improvements and Well Field Improvements

Physical Address View project details and contacts
City, State (County) San Angelo, TX   (Coke County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes: expansion of the City’s Groundwater Treatment Plant (GWTP) from a production capacity of 8.0 MGD to a production capacity of 12.0 MGD and expansion of the City’s Hickory Well Field to accommodate five (5) new public water supply production wells. The GWTP improvements will: expand the oxidation contactor system; expand the iron removal filtration system; expand the radium reduction system; construct a triplex low-head pump station; and, construct two (2) new 2.0 MG precast concrete clearwells. Improvements at the Hickory Well Field located in McCulloch County, Texas, will include: completion of well heads, electrical, controls, and site improvements; interconnecting piping and appurtenances; extension of site roadway system; and, expansion of the booster pump station to reliably provide a pumping capacity of 12.0 MGD.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents