Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Sigsbee Master Lift Station Replacement
Alteration
Bidding
Key West, FL

Lift Station No. 3 Replacement Project
Renovation
Bidding
$790,000 est. value
Plantation, FL 33324

Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Sub-Bidding
Sebastian, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Lanark East Lift Station
Results
Carrabelle, FL

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Lift Station No. 20 Replacement
Renovation
Bidding
Palm Beach Gardens, FL

Lift Station Installation and Rehabilitation
Post-Bid
Saint Cloud, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Lift Station 14-A FM Replacement and Extension
New Construction
Bidding
Bradenton, FL

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Last Updated 07/29/2021 08:31 AM
Project Title

Pump Station 83 Replacement

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32312   (Leon County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a new Pump Station to replace the existing Pump Station 83, located on a City Utility Easement south of Woodbrook Drive off Meridian Road in the Woodbrook Subdivision. The existing station shall remain on-line while the new station is constructed. The new station is a conventional duplex submersible pump station design, with an above-ground valve array. A new natural gas generator and transfer switch will also be constructed on site. The pump station improvements include all labor, equipment and materials required to deliver a complete, operable system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents