Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2021 Road Improvements
Infrastructure
Post-Bid
Sand Creek, WI

Colfax Wastewater Treatment Plant Slope Stabilization
Term Contract
Post-Bid
Colfax, WI 54730

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Durand - Eau Claire, Rock Creek Bridge, B-17-0226
Results
Durand, Eau Claire, WI 54736

2021 Road Paving
Infrastructure
Post-Bid
Sand Creek, WI 54757

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Durand - Menomonie, Red Cedar River to 490th Street
Infrastructure
Post-Bid
WI

Site Utility Distribution System Replacement - Phase 1
Results
$3,000,000 est. value
Menomonie, WI 54751

1058th Avenue Paving & 970th Avenue Chip Sealing
Results
Wheeler, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Crestwood Acres Neighborhood Street Reconstruction
Results
Weston, WI

21st Street and Utility Improvements
Results
Menomonie, WI

Reported 03/10/2022 12:15 PM
Project Title

Site Utility Distribution System Replacement - Phase II GPC

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of approximately 580 lineal feet of new direct buried steam and condensate pipes, approximately 130 lineal of of box conduit with steam and condensate pipes, one new steam pit, removal of existing steam box conduit, pipes and pits, associated surface demolition and reconstruction, including electrical, lighting, asphalt roadway, sidewalk, retaining wall, sod and landscaping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents