Similar Projects
109th Avenue Roadway Improvements - Village of Pleasant Prairie
Infrastructure
Conception
$500,000 est. value
Pleasant Prairie, WI 53158

We Energies Redevelopment / Dermody Industrial Park
New Construction, Demolition - 2,200,000 SF
Conception
$226,000,000 est. value
Pleasant Prairie, WI

Uptown Lofts
New Construction - 24,847 SF
Design
$18,000,000 est. value
Kenosha, WI 53143

Sun Pointe Village - Phase 3 / Kenosha
New Construction, Infrastructure
Design
$9,000,000 CJ est. value
Kenosha, WI 53140

Offsite Public Utility Plans for Flint 94 Commerce Center
Infrastructure
Bidding
$225,000 CJ est. value
Somers, WI 53144

2021 Village Seal Coating Program
Infrastructure
Post-Bid
Salem, WI

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Paving Program Phase 1
Results
Pleasant Prairie, WI

Village Green Center
New Construction
Construction
Pleasant Prairie, WI

The Green Bay Trail Condominiums
New Construction
Construction
Pleasant Prairie, WI 53158

Simmons Terrace
New Construction
Pending Verification
Kenosha, WI 53140

Somers Apartments
New Construction
Pending Verification
Kenosha, WI 53140

16th Avenue Extension - TI-19-005 - City of Kenosha
Infrastructure
Conception
$1,500,000 CJ est. value
Kenosha, WI 53140

North Harbor Walkway - TI-20-002 - City of Kenosha
Infrastructure
Design
$970,250 CJ est. value
Kenosha, WI 53140

Last Updated 09/23/2022 04:34 PM
Project Title

Willow Grove Subdivision

Physical Address View project details and contacts
City, State (County) Kenosha, WI 53142   (Kenosha County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of condominiums As of September 2022, this projects is on hold. It is unknown what development applications or building permits have been submitted of when construction is expected to start.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents