Similar Projects
Green Haven Parkway Phase 2
Bidding
$1,800,000 est. value
MN

Green Haven Parkway Phase 2
Bidding
$1,800,000 est. value
MN

2021 Street Rehabilitation
Post-Bid
$2,490,000 est. value
Columbia Heights, MN

2021 Street Rehabilitation
Post-Bid
$2,490,000 est. value
Columbia Heights, MN

CSAH 34 (Birch Street) Improvements
Results
Lino Lakes, MN 55014

CSAH 116 (Bunker Lake Boulevard) at TH 47 (St Francis Boulevard) Intersection Improvements
Results
$3,700,000 est. value
Ramsey, MN 55303

Prairie Knoll Park North Parking Lot Paving and Tom Anderson Trail Maintenance Improvements
Bidding
$330,000 est. value
Andover, MN 55304

2021 Street Improvements
Results
$2,300,000 to $2,700,000 est. value
Lino Lakes, MN

TH 65 East Service Road
Bidding
$5,000,000 est. value
East Bethel, MN

Grading, Bituminous Surfacing, Signals, ADA Improvements, TMS and Bridge No. 02552
Results
MN

2021 Pavement Maintenance-Chip Seal Program
Bidding
Columbus, MN

Parking and Pedestrian Safety Upgrades at AMRTC - General
Results
Less than $550,000 est. value
Anoka, MN 55303

2021 Pavement Maintenance - Crack Seal Program
Bidding
Columbus, MN

Parking and Pedestrian Safety Upgrades at AMRTC - Electrical
Results
Less than $550,000 est. value
Anoka, MN 55303

Street Reconstruction
Bidding
Coon Rapids, MN

Last Updated 03/08/2021 12:02 PM
Project Title

2021 Mill and Overlay and 2021 Curb, Sidewalk and Ped Ramp Repairs

Physical Address View project details and contacts
City, State (County) Anoka, MN   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,276,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

TH 10, north on Hanson Boulevard, east on Bunker Lake Blvd, north on Prairie Road to site.Mill and overlay of existing neighborhood streets. Random curb and gutter removal and replacement. Exposed and repair bolts on water main gate valves. Miscellaneous curb and sidewalk repairs.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents