Similar Projects
Urban Target Store, Conference Center Hotel
New Construction
Conception
Louisville, KY 40208

NuLu Crossings Mixed-Use Development
New Construction - 339,000 SF
Conception
$78,000,000 est. value
Louisville, KY 40202

Warehouse and Parking Development
New Construction - 112,000 SF
Design
$375,000 est. value
Louisville, KY 40216

Jeffersontown Police Headquarters
New Construction - 25,000 SF
Design
Jeffersontown, KY 40299

RFP D/B - Design Build Transit Center and Parking Garage
New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Frankfort, KY 40601

East Marshall New Fire Station
New Construction, Infrastructure - 12,420 SF
Bidding
$4,700,000 CJ est. value
Gilbertsville, KY 42044

Zoneton Fire Protection District 2 Interior Renovation
Demolition, Build-out, Renovation
Sub-Bidding
$11,000,000 CJ est. value
Brooks, KY 40109

Parking Garage Repairs
Post-Bid
Louisville, KY 40209

Pleasure Ridge Park Fire Station 1
Renovation
Post-Bid
Louisville, KY 40258

Station 5 Renovations
Renovation
Results
Louisville, KY 40216

Garrard County EMS
Results
$3,200,000 est. value
KY

John R. Green Development
New Construction, Renovation - 341,500 SF
Construction
$38,000,000 est. value
Covington, KY 41011

Hendron Fire New Station
New Construction
Construction
$1,200,000 est. value
Hendron, Paducah, KY 42003

NuLu Yard
New Construction, Infrastructure - 70,000 SF
Pending Verification
$30,000,000 CJ est. value
Louisville, KY 40202

One Park North Tower Mixed-Use Development
New Construction - 289,365 SF
Conception
$10,000,000 CJ est. value
KY 40206

Last Updated 08/22/2022 10:02 AM
Project Title

Fire Station 2

Physical Address View project details and contacts
City, State (County) Pikeville, KY 41501   (Pike County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Parking Garage
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,471,471 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 22, 2022 , this project has not yet been awarded. The project is expected to be awarded on August 9, 2022. Project consists of the renovation of an existing facility to change the use to a Fire Station. The Occupancy Classifications are Low Hazard Storage (S-2) for the emergency vehicle garage and Residential (R-2) for the living quarters. The Construction Type is VB and the total gross square footage of the building is approximately 4,900 SF. The project includes an emergency vehicle garage and living quarters with sleeping areas, a kitchen, lounge, restrooms, utility room, and an office.

Details

4,900 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents