Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Eugene Street Water and Wastewater Replacement Project
Infrastructure
Bidding
$1,460,000 CJ est. value
Hood River, OR 97031

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir
Infrastructure
Results
$10,207,115 CJ est. value
Boardman, OR 97818

Two Rivers Correctional Institution (TRCI) EVAC System Part Upgrade
Term Contract
Post-Bid
Umatilla, OR 97882

Wastewater Treatment Plant Improvements
Infrastructure
Results
$5,250,000 CJ est. value
Falls City, OR 97344

Last Updated 06/01/2023 03:59 PM
Project Title

Waite Ranch Tidal Wetland Restoration

Physical Address View project details and contacts
City, State (County) Florence, OR 97439   (Lane County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,817,763 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for restoration and tidal reconnection of the Waite Ranch site by excavating new channels and filling drainage ditches, constructing an earthen setback dike and removing part of the existing dike, constructing a new concrete tide gate structure, and installing large wood structures. The setback dike will be constructed using a combination of soil excavated from onsite, contractor-furnished imported fill material, and owner-furnished imported fill material that must be trucked into the site. Additional work will include construction access, staging, and traffic control; work area isolation, dewatering, and fish removal; erosion and sediment control. These work activities and other work activities related to or required for performing the work shall be in accordance with the Plans, the Special Provisions, and the Oregon Standard Specifications for Construction. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Est. Value Notes: Estimated value of the bid is between 5,000,000 and 10,000,000 Est. Completion Date: July 15, 2025 All bids rejected.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents