Similar Projects
White Oak Crossing Mini Storage
New Construction
Conception
North Little Rock, AR 72113

Van Dyke Center
New Construction
Conception
Rogers, AR 72756

Helios Storage
New Construction - 33,465 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hot Springs, AR 71901

Modern Storage
New Construction - 309,921 SF
Design
$10,000,000 CJ est. value
Springdale, AR 72762

Jonesboro Shooting Sports Complex, Phase IIA - Shooting Complex Storage
New Construction - 8,000 SF
Bidding
$900,000 est. value
Jonesboro, AR

Centerton Fire Station #2
New Construction
Bidding
Centerton, AR 72719

Wellington Hills Apartments
New Construction
Sub-Bidding
Little Rock, AR 72211

Renovation of an Existing Metal Building to House the Malvern Police Department
Renovation
Post-Bid
Malvern, AR 72104

Benton Fire Station #6
New Construction - 5,603 SF
Post-Bid
Benton, AR 72019

General Contractor for a Maintenance Building
New Construction - 36,000 SF
Results
Bentonville, AR

Construction of the Fayetteville Parking Deck
Infrastructure
Results
Less than $1,250,000 est. value
Fayetteville, AR

Southern Shingle Addition
New Construction, Addition
Construction
Bryant, AR 72022

Wagon Wheel Storage
New Construction - 802,770 SF
Construction
$10,000,000 CJ est. value
Springdale, AR 72762

Tree Climbers Warehouse
New Construction - 11,760 SF
Pending Verification
Fayetteville, AR

Rogers Warehouse Development
New Construction
Pending Verification
Springdale, AR

Last Updated 04/20/2022 03:01 AM
Project Title

Fire Station Addition

Physical Address View project details and contacts
City, State (County) Manila, AR   (Mississippi County)
Category(s) Commercial, Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Parking Garage, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a single story building addition comprised of approximately 5,000 s.f., fire truck parking bays and work areas. Building will be concrete slab on grade, pre-engineered steel building system, standing seam metal roof, fiberglass roof and wall insulation, exterior prefinished metal wall panels with masonry trim. Work includes HVAC, plumbing, electrical, and fire protection system, including new fully automatic fire sprinkler system and addressable fire detection alarm system, throughout both new and existing building areas. (Total of new and existing building area is approximately 10,000 s.f.)

Details

Fire/Police Station, 1 Story Above Grade, Approximately 10,000 SF Addition, Warehouse/Storage, Addition, Parking Garage, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents