Similar Projects
Morris Recreation Center Expansion
Renovation, Addition
Conception
Commerce, TX 75429

Anna Indoor Recreation Facility
New Construction
Conception
Anna, TX

Orangetheory Fitness
Renovation - 3,200 SF
Design
$350,000 est. value
Hudson Oaks, TX 76087

Planet Fitness
Renovation - 22,094 SF
Design
Allen, TX 75002

The Construction of McKinney Sports Complex
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
McKinney, TX 75070

Sterling Point Rec Center
New Construction, Infrastructure - 2,890 SF
Bidding
$360,000 CJ est. value
Baytown, TX 77521

Playground Equipment for Canyon Lake Resource and Recreation Center
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Canyon Lake, TX 78133

Generator Annual Maintenance and Services
Term Contract
Sub-Bidding
Coppell, TX 75019

LA Fitness
Renovation - 54,000 SF
Post-Bid
Dallas, TX 75248

Athletic Upgrades - Gymnasium Building
New Construction
Post-Bid
Tilden, TX

Demolition, Site Preparation and Construction of New Weight Room
New Construction
Results
$804,427 est. value
Stockdale, TX 78160

Meyersville School Project
Renovation - 27,000 SF
Results
$3,500,000 to $6,500,000 est. value
Meyersville, TX 77974

Latitude Plano Apartment Homes
New Construction
Construction
Plano, TX 75075

LA Fitness
New Construction - 34,000 SF
Construction
$5,000,000 est. value
Frisco, TX 75035

New Auxiliary Gym at Orange Grove High School
New Construction
Pending Verification
Orange Grove, TX 78372

Last Updated 08/08/2022 04:02 PM
Project Title

Griffis at the Domain / Fitness Center

Physical Address View project details and contacts
City, State (County) Austin, TX 78758   (Travis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Fitness Center
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $508,068 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fitness center interior finish remodel. As of August 8, 2022, final planning is underway. A building permit application has been filed with the City of Austin Building Department and is under review. A general contractor has been selected. A firm timeline has not been established, but construction is expected to begin third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,473 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents