Similar Projects
Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

New City Hall Complex & Westside Fire Station No. 2
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

SWFD Station Design
Design
Miramar Beach, FL 32550

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Kathleen Fire Rescue Station
New Construction - 11,487 SF
Post-Bid
Less than $3,600,000 est. value
Bartow, Lakeland, FL 33810

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Construction Manager at Risk Fire Department
Results
Mount Dora, FL

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Station 10
Construction
Port Charlotte, FL 33948

Fire Station 64 Replacement at Kiwanis Park
Renovation
Design
Coral Springs, FL 33071

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Build a Fire Station in Sumatra
Results
Less than $59,400 est. value
Bristol, Sumatra, FL 32321

Design-Build for Fire Station 71
- 9,000 SF
Construction
Less than $3,010,000 est. value
FL

Fire Station #2
New Construction
Design
New Port Richey, FL 34652

Reported 05/26/2021 09:33 AM
Project Title

Fire Station No. 81 and Police Evidence Building

Physical Address View project details and contacts
City, State (County) De Land, FL 32720   (Volusia County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Nearing Completion, Construction Completion Expected September 2021
Bids Due View project details and contacts
Estimated Value $6,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fire Station No. 81 consists of 2 new buildings full sprinklered; new 2-story fire station building of approx 15,780 sf; tiltwall concrete with composite concrete floors and membrane roofing on metal roof deck system; new reserve apparatus garage of approx 3,030 sf, pre-engineered metal building. Police Evidence Building - a new approx 4,568 sf fully sprinkler pre-engineered metal building to be used as a Police Evidence Processing and Storage Facility. The budget for fire station 81 is $5M and police evidence building is $1.25M.

Details

,, 23,378 SF - 1 Fire/Police Station, 2 Stories Above Grade, Approximately 15,780 SF New Construction, 1 Fire/Police Station, 1 Story Above Grade, Approximately 3,030 SF New Construction, 1 Fire/Police Station, 1 Story Above Grade, Approximately 4,568 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents