Similar Projects
Last Updated 11/29/2018 11:23 AM
Project Title

Push Button - South Roadway Resurfacing

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,271,664
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description A. Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. B. Work includes but is not limited to the following: Milling and resurfacing, widening and resurfacing of intersecting streets, up to the existing joint at the side street or up to the Point of Curvature as determined by the Engineer or as indicated in the Plans, resurfacing of asphaltic pathways (pedestrian, bicycle, etc.) adjacent or not to the edge of pavement as necessary, temporary utility repairs (cold patches), clearing and excavating of shoulder areas or build-up, as directed by the Engineer; grading and clean-up of adjacent shoulders and removal of roots, as required, pavement markings including the installation of reflective pavement markers(blue/blue) at fire hydrant locations, sidewalk, sidewalk curbs and connectors, and pedestrian ramps. Resurfacing work may include any of the following: a. Application of asphaltic concrete surface course to existing wearing course. b. Application of asphaltic concrete leveling courses to existing wearing surfaces prior to and in preparation for item (a) above. c. Application of asphaltic concrete to previously primed rock roads. d. Resurfacing of private driveways shall be limited to feathering of the asphaltic concrete mat to a point two (2) feet from the edge of the roadway. Resurfacing of the remainder of private driveways is expressly prohibited under this Contract, unless directed by the Engineer. e. The contractor shall adjust all storm water, water and sewer valves and manholes prior to resurfacing. All adjustments shall be made by the built-up method, not by the use of adjustment of rings. C. If any changes are required due to conflict of design and or field conditions, the Engineer will make the final determination.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents