Similar Projects
East Clinton New Middle School
New Construction
Conception
Wilmington, OH

Milford Exempted Village Schools Bond Proposal
New Construction, Renovation, Demolition
Conception
$98,000,000 est. value
Milford, OH 45150

Fremont City Schools-High School And Career Tech
New Construction - 192,251 SF
Design
$50,632,524 est. value
Fremont, OH

PK-12 School
New Construction, Demolition
Design
Springfield, OH 45503

New PK-12 School
New Construction - 183,538 SF
Post-Bid
Less than $43,000,000 est. value
Burton, OH 44021

Kettering - Southdale Elementary Classroom Addition
Addition - 4,700 SF
Post-Bid
Kettering, OH 45409

Middle School Athletic Improvements
Results
Less than $7,142,662 est. value
Marysville, OH 43040

Renovations - Autotech Lab
Renovation
Results
Marysville, OH 43040

St. Martin de Porres High School - Phase II
New Construction - 25,000 SF
Construction
$8,279,000 est. value
Cleveland, OH 44103

Fremont City Schools-Elementary Schools
Construction
$56,498,048 est. value
Fremont, OH

Warrensville Heights Segment 2F
Design
Less than $38,259,699 est. value
Warrensville Heights, OH 44128

Kettering - Orchard Park Elementary Addition
Addition - 6,000 SF
Post-Bid
Kettering, OH 45429

High School Athletic Improvement
New Construction - 2,623 SF
Results
Less than $5,470,000 est. value
Marysville, OH 43040

John F. Kennedy High School
New Construction
Construction
Cleveland, OH 44105

Tusky Valley New Middle/High School - Segment 1
New Construction - 96,956 SF
Design
Less than $24,602,482 est. value
Bolivar, Zoar, OH 44612

Last Updated 02/26/2021 02:46 PM
Project Title

CMR Services for Two New Elementary Schools and a Middle School

Physical Address View project details and contacts
City, State (County) Lewis Center, OH   (Delaware County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $94,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be completed in two phases. Phase one is a single elementary and phase two consists of an elementary and middle school. This project requires monitoring of project schedules, materials, and processes relevant to the new construction of the Project.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents