Similar Projects
Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Blueberry Road
Infrastructure
Design
$410,000 CJ est. value
Milladore, WI 54454

Marshfield Armory Install Site Fencing - GPC
Infrastructure
Bidding
$285,000 CJ est. value
Marshfield, WI 54449

2022 Crack Sealing Program Bid
Infrastructure
Bidding
$90,000 CJ est. value
Wisconsin Rapids, WI 54494

Wood County Sheriff's Department Law Enforcement Center Bid Package #2
Addition, Demolition, Infrastructure - 168,534 SF
Sub-Bidding
$50,000,000 CJ est. value
Wisconsin Rapids, WI 54494

Asphalt Pavement Projects - 2021
Renovation
Post-Bid
Marshfield, WI

Parking and Motorcycle Training Lot
Post-Bid
Marshfield, WI 54449

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Local Road Improvement Program (LRIP)
Results
Hewitt, WI 54441

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Caribou Coffee -8th Street / Wisconsin Rapids
New Construction, Infrastructure - 300 SF
Pending Verification
$100,000 CJ est. value
Wisconsin Rapids, WI 54494

Highway and Structure
Infrastructure
Post-Bid
Marshfield, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Road Work
Infrastructure
Post-Bid
Marshfield, WI

Last Updated 09/08/2022 05:32 PM
Project Title

Green Acres Estates 1st Addition (Street Opening)

Physical Address View project details and contacts
City, State (County) Marshfield, WI 54449   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,668,695 [brand] Estimate
Plans Available from Agency's Affiliate - 06/24/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of 09/08/2022 Their elected body chose not to award this project As of September 1, 2022, this project has not yet been awarded. At this time, the project is not expected to be awarded. It has not been confirmed if the project will be rebid. Bids will then be reviewed, tabulated, and submitted to the Board of Public Works on Monday, July 18th, 2022 for consideration and recommendation to the Common Council at their regular meeting on Tuesday, July 26th, 2022 for Award of Contract. Contract 2022-02 includes the opening and construction of new streets within the Green Acres Estates 1st Addition (street opening), including: o E. 21st Street, Washington Avenue to Green Acres Drive. o S. Aspen Avenue, 21st Street to Herkert Drive. o Herkert Drive, 21st Street to Aspen Avenue. o Madi Circle, 21st Street to 21st Street. Street/opening construction will include new sanitary sewer mains, manholes and laterals; new water mains, valves, hydrants and services; new storm sewer mains, catch basins, area drains and storm laterals; along with new streets with drained subbase, pipe underdrains, geotextile fabric, concrete curb & gutter and asphalt pavement (by others). This project will also include the removal/filling of the existing wet pond (located at the southeast corner of 21st Street and Aspen Avenue), construction of a new wet pond detention basin, construction of side/rear lot-line ditches and an asphalt path. All new streets will remain closed to through traffic and pedestrian traffic until completed. Washington Avenue shall be closed to all traffic (with detour required by Contractor) for the proposed water main connections and street repairs at 21st Street. BID DOCUMENTS ARE NOT YET AVAILABLE FOR DOWNLOAD.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents