Last Updated 01/02/2019 12:27 PM
Project Title

2018 Drainage Basin Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Atlantic City, NJ   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Conduct utilities mark-out and obtain clearance from each and every utilities company that have stake within and close to the projects' site. Strip the top 6 inches of topsoil from the top of the infiltration basin, including roots, and place into a temporary stockpile location within the basin. Excavate the infiltration trench to the design dimensions. Place excavated materials at least 10 feet away from the edge of the infiltration facility to enhance trench wall stability. Remove/trim tree roots. Excavate to depths as shown, or as directed. Do not excavate with vertical side walls. Maintain a side slope gradient of maximum 1.0:1.0. The bottom of the infiltration facility shall be separated by at least two feet vertically from the seasonally high water table. Roughen/till the bottom and the sides of the excavation at least 6 inches using an equipment's finger. Place 6 inches of narrowly graded aggregate meeting 100 percent passing a 1-1/2 inch sieve and 0 to 5 percent passing a No. 8 sieve (ASTM D 448). Level the top of the aggregate. Place aggregate (without mixing) in 12 inch loose lifts, and level the surface before placing additional lifts. Place a 4 to 6 inch layer of the stripped topsoil over the final grade of the aggregate material. Base Bid: Basins at Mile Post 26.70, Mile Post 27.15 and Mile Post 27.30 Add Alternate 1: Maintenance and Protection of Traffic for Basins at Mile Post 26.70, Mile Post 27.15 and Mile Post 27.30 Add Alternate 2: Basin at Farley Service Plaza Mile Post 21.30 Add Alternate 3: Maintenance and Protection of Traffic for Basin at Farley Service Plaza Mile Post 21.30 Add Alternate 4: Basin at Mile Post 10.1 Add Alternate 5: Maintenance and Protection of Traffic for Basin at Plaza Mile Post 10.1
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents