Similar Projects
South Chicago Street Industrial Development
New Construction, Infrastructure - 2,155,584 SF
Conception
$230,000,000 CJ est. value
Joliet, IL 60436

3501 Industrial-Joliet
New Construction, Infrastructure - 18,000 SF
Conception
$10,000,000 CJ est. value
Joliet, IL 60436

2022 Foundation Wall Repair
Renovation
Design
$231,581 CJ est. value
Wilmington, IL 60481

Guiding Light Academy Addition
Addition, Infrastructure, Renovation
Design
$2,500,000 CJ est. value
Shorewood, IL 60404

HMA Multi-Use Path, PCC Sidewalk, Drainage Items, and Other Necessary Work Along Bridge Street
Infrastructure
Bidding
$2,000,000 CJ est. value
Channahon, IL 60410

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 1 Packages #1 through #2
Addition, Demolition, Renovation, Infrastructure
Bidding
$380,000 CJ est. value
Romeoville, IL 60446

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Chelsea Addition and Interior Renovation
Renovation, Addition
Post-Bid
Frankfort, IL 60423

Weight Room, Wellness Center, and Dance Studio Refurbishing
Renovation
Results
Channahon, IL

New Transportation Center
New Construction
Results
Joliet, IL

Farnsworth Avenue Bridge Phase III - City of Aurora
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Aurora, IL 60503

West Eames Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Channahon, IL 60410

VIP Alliance Trucking Facility
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Joliet, IL 60432

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

2022 Sanitary Sewer Point Repair Project - Bridal Wreath and Parkview
Infrastructure
Bidding
$300,000 CJ est. value
Joliet, IL 60432

Last Updated 09/07/2022 05:04 AM
Project Title

2022 Addition and Renovation - Crete-Monee High School

Physical Address View project details and contacts
City, State (County) Crete, IL 60417   (Will County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,838,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders will be required to complete a Registered Plan Holder Record form and a Bidding Documents License Agreement for the Project. Upon receipt of a completed Registered Plan Holder Record form and a Bidding Documents License Agreement, prospective bidders will be sent bidding documents and will become registered plan holders. During the bidding period, the office of the Architect will send project addenda, clarifications, and other project information to registered plan holders via the email address(es) listed on the Registered Plan Holder Record on file at the Architect's office. Bids will be received on General Contract Work, including all trades. BIDDER RESPONSIBILITY Each Bidder must satisfactorily complete the Bidder Responsibility process described in Section 01 00 00 - Bidder Responsibility Criteria of the Project Manual by providing the required Documents. The required Documents must be delivered along with the bidder's sealed bid at the same place and time required for the bid. Contents of each bidder's Responsibility Criteria Documents will be available for public review. The Bidder Responsibility Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to not less than ten percent (10%), of the bid and made payable to Board of Education, Crete-Monee Community Unit School District 201-U, 1500 Sangamon Street, Crete, Will County, Illinois 60417. No bid shall be withdrawn for a period of thirty (30) days after the bids opening date without the consent of the Owner. Checks or drafts of unsuccessful bidders will be returned as soon as practical after opening and checking the bids. Successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.). The Owner reserves the right to reject any or all bids and to waive any informalities in bidding.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents