Similar Projects
Last Updated | 07/13/2021 09:06 AM |
Project Title | Memorial Park Play Ground Relocation Project |
Physical Address | View project details and contacts |
City, State (County) | Pottstown, PA 19464 (Montgomery County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Greater than $25,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Memorial Park play Equipment currently has a problem with groundwater infiltrating to the existing Rubber P.I.P (Personal injury Protection) mat causing damage to the playground Therefore the playground Equipment needs to be relocated to higher Ground. The project has 2 stages. Stage one involves Removing the Gametime Dragon Fly, Gametime 2-5 Play Structure W/Signage, Gametime 5-12 Play structure W/Signage and the Three Bay Arch Swing set as well as removing and disposing of existing concrete Footings for these play structures off site. Stage two involves Installation of The Gametime Dragon Fly, Gametime 2-5 Play Structure W/Signage, Gametime 5-12 Play structure W/Signage and the Three Bay Arch Swing set all in a new location to be determined by the Pottstown Parks and Rec Director. Installation will be installed according to manufactures. |
||||||||
Details | Park/Playground, Addition.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |