Similar Projects
Paved Town Trail Phase III
Infrastructure
Bidding
Brian Head, UT

Sr-132 - 300 W to MP 34.73 Preservation High Volume
Infrastructure
Bidding
$1,500,000 to $300,000 est. value
UT

Milling and Repaving Exchange Road
Post-Bid
UT

400 North Widening Project - Phase 1
Post-Bid
Less than $1,260,000 est. value
Wellsville, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

Sandy City 2020 Overlay Project
Results
Sandy, UT 84070

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

SR-289; SUU Loop
Infrastructure
Bidding
$500,000 to $1,500,000 est. value
UT

Construction of the Castle Dale City Street Project 2021
Post-Bid
Castle Dale, UT

Richfield Warehouse Yard Parking Upgrade
Results
$250,000 to $500,000 est. value
Richfield, UT 84701

1800 North 600 West Roadway Improvements
Infrastructure
Bidding
Logan, UT 84321

1970 South 1200 West Street Construction Project
Post-Bid
$1,100,000 est. value
Woods Cross, UT 84087

Pintura MS4
Results
Pintura, UT 84720

2022 200 South Reconstruction Project
Infrastructure
Bidding
Less than $323,094 est. value
Bountiful, UT

Asphalt Parking Lots
Post-Bid
Cedar City, UT 84721

Last Updated 01/20/2022 09:04 AM
Project Title

UT Flap 218(1) Sheep Creek Loop

Physical Address View project details and contacts
City, State (County) Manila, UT   (Daggett County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UT FLAP 218(1), Sheep Creek Geologic Loop Project is located on Highway 218 approximately 7 miles south of Manila, UT in Northeast Utah. The project crosses through private and Ashley National Forest (USFS) Lands, providing access to the Flaming Gorge-Uintas National Scenic Byway. The route is categorized as a rural recreational and scenic roadway in level terrain and is maintained by Dagget County. This project proposes reconstruction, widening, minor profile adjustments, guardrail replacement, and drainage improvements of 1.85 miles of roadway on the Sheep Creek Geologic Loop. Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including a concrete box culvert), cattleguard installation, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated or reconstructed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents