Similar Projects
Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

Golf Club Road Water and Wastewater Improvements
Infrastructure
Bidding
$8,000,000 CJ est. value
Lacey, WA 98503

Golf Club Road Water and Wastewater Improvements
Infrastructure
Bidding
$8,000,000 CJ est. value
Lacey, WA 98503

Housing Development YNHA
New Construction - 46 SF
Post-Bid
Wishram, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SouthWest Mosman Avenue Phase Two
Infrastructure
Results
$1,150,000 to $1,270,000 est. value
Yelm, WA 98597

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Urban Olympia 10 Apartments
New Construction
Construction
$12,000,000 est. value
Olympia, WA 98501

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

9th & Fern Apartments
New Construction - 405,980 SF
Conception
$3,000,000 est. value
Olympia, WA 98502

Last Updated 02/16/2023 03:26 PM
Project Title

Tickner Subdivision

Physical Address View project details and contacts
City, State (County) Tumwater, WA 98512   (Thurston County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $238,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of apartments and townhouses on 10.7 acres and single family homes on 77.77 acres. Scope details have not been released. As of February 16, 2023, this project has been abandoned. No further progress is expected from the developer. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents