Similar Projects
Septic System Replacement
Infrastructure
Design
$500,000 CJ est. value
Staunton, IL 62088

Drainage Project
Infrastructure
Design
Staunton, IL 62088

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

6.8 Miles of Cold In-Place Recycling Standard Overlay on Il 138 from Il 159 to Sawyerville Hills Road, 0.9 Miles East of Wilsonville
Infrastructure
Results
IL

Plumbing and Electrical Work at the Bertagnoli Park
Infrastructure
Design
$200,000 CJ est. value
Bunker Hill, IL 62014

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Patching on I-55 from the Madison/Macoupin County Line to the Montgomery/ Sangamon County Line
Infrastructure
Results

Gazebo at the Mae Meissner Whitaker Park
New Construction, Infrastructure
Design
Bunker Hill, IL 62014

MCHA Paving 2022
Infrastructure
Post-Bid
$200,000 CJ est. value
Carlinville, IL 62626

New Circle Drive Carlinville Intermediate School
Renovation, Infrastructure
Results
$800,000 est. value
Carlinville, IL 62626

Concrete Work - Replacement of Paving, Adding Mailboxes and Altering Drainage
Infrastructure
Post-Bid
$300,000 CJ est. value
Gillespie, IL 62033

Full-Depth Pavement Reclamation With Bituminous Surface Treatment on Winchester-glasgow Road
Infrastructure
Results
$4,000,000 est. value
Staunton, IL 62088

Macoupin County Public Health Department (MCPHD) Renovation Interior Renovations, Parking Lot, Roof
Infrastructure, Renovation
Post-Bid
$50,000 CJ est. value
Carlinville, IL 62626

Last Updated 04/14/2023 01:08 PM
Project Title

Tower Roof Renovations and New Parking Lot for the Historic Macoupin County Jail

Physical Address View project details and contacts
City, State (County) Carlinville, IL 62626   (Macoupin County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Prison/Jail, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $115,875 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bids shall include: 1. Properly completed Proposal Form in duplicate. 2. Bid Deposit in the amount of 5% of the Base Bid. 3. Not less than the prevailing hourly wage rate as determined by the Illinois Department of Labor pursuant to Illinois Revised Statutes, Ch. 489, Sec. 39s-1 et. seq. All Bidders are advised that all work of this Contract shall be subject to the provisions of the "Illinois Prevailing Wage Act." Prevailing wage rates have been determined and are on ile at the Ofice of the State of Illinois Department of Labor, telephone 217-782-6206 or on the website . All Bidders shall submit and enclose with their bid a notarized certiication that the Contractor is not barred from bidding on the Contract as a result of a violation of either Section 33 E-3 or 33 E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989. Certiication is located in the Proposal Form, Section 00300, of the Project Manual. During the performance of this contract, the Contract shall not discriminate against any employee or applicant for employment on the basis of race color, creed, national origin, gender, age or any other basis in violation of any applicable law, rule, regulation or ordinance, and shall otherwise perform in accordance with all such laws, rules, regulations and ordinances. Bids shall be accompanied by a bid bond, bank draft, certiied check or cashier's check in the amount of ive percent (5%) of the Base Bid, made payable to Macoupin County. Failure of Bidders to submit bid bond, certiied check or cashier's check in amount to cover proposals bid upon is cause for rejection of bid. Successful Bidder will be required to provide Surety Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract cost on prescribed forms within ten (10) days after notice of acceptance is issued by Owner. Surety on bond shall be by duly authorized company acceptable to Owner. Macoupin County reserves the right to reject any or all bids and reserves the right to waive any irregularity in bidding, which in their considered opinion is warranted. No bid shall be withdrawn for Sixty (60) days after opening of bids without written consent of the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents