Similar Projects
US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Infrastructure
Conception
$10,004,000 CJ est. value
Pasco, WA 99301

I-182/Over Railroad Bridge EB - Bridge Painting
Infrastructure
Conception
$1,733,000 CJ est. value
Pasco, WA 99301

US 12/Snake River Vaughn Hubbard Bridge EB - Repair Floor Beams
Infrastructure
Design
$1,016,000 CJ est. value
Pasco, WA 99301

I-182/Col R Lee-Volpentest Columbia River Bridge EB - Joint Repair
Infrastructure, Renovation
Design
$1,930,000 CJ est. value
Pasco, WA 99301

GESA Stadium Improvements
Addition, Demolition, Build-out, Infrastructure
Bidding
$2,000,000 CJ est. value
Pasco, WA 99301

MNA Levee Drainage Pump Upgrade
Infrastructure
Bidding
$100,000,000 CJ est. value
Pasco, WA 99301

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Argent Road Improvements Phase 2
Infrastructure
Results
$950,000 to $1,200,000 est. value
Pasco, WA

East Ford Avenue and West Date Street Water Main Replacements
Infrastructure
Results
$250,000 to $300,000 est. value
Connell, WA

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

Community Center New Construction - West side of Pasco - City of Pasco
New Construction, Infrastructure
Conception
$8,150,000 CJ est. value
Pasco, WA 99301

I-182/Yakima River RC Bremmer Bridges - Joint Repair
Infrastructure, Renovation
Design
$2,689,000 CJ est. value
Pasco, WA 99301

Last Updated 08/11/2023 07:03 AM
Project Title

Process Water Reuse Facility (PWRF) Phase 2: Winter Storage

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $31,588,247 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes clearing and grubbing of approximately 202 acres; cut and haul of approximately 1.3 million cubic yards of soil; construction of three lagoons totaling 329 million gallons of storage; installation of approximately 5,000 linear feet of embankment drains; installation of approximately 5,500 linear feet of deep excavation, 42 to 48-inch-diameter FRP gravity process water main around the perimeter of the PWRF site; installation of approximately 4,500 linear feet of 30-inch-diameter high density polyethylene (HDPE) gravity main; approximately 5,350 LF of 12-inch-diamter HDPE process water force main; approximately 1,700 LF of 10-inch-diamter HDPE process water force main; installation of approximately 7,200 LF of 8-inch-diameter HDPE force main within the proposed lagoon embankments; modifications to an existing irrigation pump station wet well; construction of concrete process water conveyance structures; process water appurtenances including flow meters, valves and slide gates; approximately 16,000 LF of power and fiber optic conduit; importing of approximately 45,000 cubic yards of various fill material; and other work, all in accordance with the Contract Plans, Special Provisions, and the Standard Specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This contract contains intermediate milestones and three-hundred and seventy-five (375) working days to physically. complete the work. Para más información o para solicitar un intérprete, favor de comunicarse con Janette Romero al 509-543-5738 o romeroj1@pasco-wa.gov Technical questions regarding the scope of this project should be put in writing up until three working days prior to bid opening and directed to Teresa Reed-Jennings, PE - Senior Engineer, City of Pasco, Public Works, 525 N. 3rd Avenue, PO Box 293, Pasco, WA 99301, Email: reed-jenningst@pasco-wa.gov.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents