Last Updated 02/12/2021 08:29 AM
Project Title

2021 Local Streets, W. First St., Madison St., Keeney St., Horace St., Polly St., Orchard St., Scarlett Lane

Physical Address View project details and contacts
City, State (County) Perry, MI   (Shiawassee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $252,965
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of reconstruction of 2021 LOCAL STREETS - W. FIRST ST., MADISON ST., KEENEY ST., HORACE ST., POLLY ST., ORCHARD ST. and SCARLETT LANE all within The Perry City Limits: Construction shall include areas of pulverizing, balancing and repaving existing bituminous road ways totaling approximately 1,850 s.yd; areas of cold milling and re-paving existing bituminous roadways totaling approximately 8,000 s.yd., overlay areas of existing bituminous roadways totaling approximately 4,200 s.yd.; replacement of bituminous leveling course and wearing course totaling approximately 1,700 tons, manhole and water valve adjustments; limited concrete curb & gutter replacement; signing and traffic control, cleanup and restoration and other miscellaneous work items that normally are included with the described work items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents