Similar Projects
Waco Boats Manufacturing Plant
Addition
Conception
Little Rock, AR 72206

Standard Lithium Extraction Plant
New Construction
Conception
$100,000,000 est. value
El Dorado, AR

Tractor Supply Distribution Facility
New Construction - 900,000 SF
Design
$90,000,000 to $100,000,000 est. value
Maumelle, AR 72113

Brick Oven Pizza
New Construction - 3,657 SF
Design
$500,000 to $1,000,000 CJ est. value
Siloam Springs, Springdale, AR 72762

Murphy #2587/#6802/#7879 / Cabot
Demolition, New Construction, Infrastructure - 2,800 SF
Bidding
$2,500,000 CJ est. value
Cabot, AR 72023

Duck Donuts
Renovation - 1,214 SF
Post-Bid
Rogers, AR

Downtown Development Services and Main Street Program
Renovation
Post-Bid
Fort Smith, AR

Restroom and Concessions Stand for Joe Mack Campbell Park
New Construction
Results
$500,000 est. value
Jonesboro, AR 72401

Lakeside Middle School Cafeteria and ADA Toilet Addition
Addition, Demolition, Renovation, Infrastructure - 4,545 SF
Results
Lake Village, AR 71653

Aria Convenience Store
New Construction, Infrastructure - 3,800 SF
Construction
$1,000,000 CJ est. value
Bryant, AR 72022

Starbucks / Bentonville
New Construction, Infrastructure - 1,921 SF
Construction
$800,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

FedEx Ground Distribution Center
New Construction - 318,000 SF
Pending Verification
$29,000,000 est. value
Jonesboro, AR 72401

South Coast Baking Expansion
Addition, Infrastructure - 90,575 SF
Conception
$48,600,000 CJ est. value
Springdale, AR 72762

Simmons Foods Processing Facility and Storage Yard
New Construction, Addition
Design
Siloam Springs, AR 72761

Last Updated 07/07/2023 11:22 AM
Project Title

Westrock Coffee Company / Conway

Physical Address View project details and contacts
City, State (County) Conway, AR 72034   (Faulkner County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Food/Beverage Service, Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 530,000 square feet of manufacturing space. As of July 7, 2023, it is unknown if this project has started construction. Information regarding an architect and a general contractor has not been released. A firm construction timeline has not been confirmed. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

530,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents