Similar Projects
CCCC Frank and Maureen Wilkens Science and Engineering Center
New Construction - 39,000 SF
Design
Less than $27,669,071 est. value
Barnstable, MA 02668

Benjamin Franklin Institute of Technology
New Construction - 85,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Roxbury, MA

Wellesley Hills Campus Room 242 Renovation - General
Renovation
Bidding
Wellesley, MA

Lederle Graduate Research Center Low-rise Multipurpose Room Fit-out and Toilet Room Upgrades -General
Renovation
Bidding
$1,842,837 est. value
Amherst, MA 01003

Bunker Hill Community College - New Student Success Center - Building E Renovations - Filed Sub Bids
New Construction, Renovation - 95,000 SF
Post-Bid
Less than $54,400,000 est. value
Boston, MA 02129

Campus Police and Admissions Renovations - General Bids
Post-Bid
$500,000 est. value
Wellesley, MA 02481

UMass Dartmouth SENG Project - Filed Sub Bids
Results
Less than $33,500,000 est. value
Dartmouth, MA

Courtyard Renovations - General Bids
Results
Less than $2,000,000 est. value
Greenfield, MA 01301

Boston University Goldman School of Dental Medicine
New Construction, Renovation - 95,000 SF
Construction
$83,000,000 est. value
South End, MA 02118

Gymnasium Envelope Project - General Bid
Renovation - 3,500 SF
Construction
$2,395,102 est. value
Buzzards Bay, MA 02532

MIT School of Architecture and Planning
Renovation - 217,000 SF
Pending Verification
Cambridge, MA 02139

Nantucket Island School of Design and the Arts Barn and Secondary Facility
New Construction
Pending Verification
Nantucket, MA 02554

1003-1013 Harrison Avenue
New Construction - 68,000 SF
Design
Boston, MA 02119

Tech Tower Elevator Modernization
Renovation
Bidding
$150,000 est. value
Wellesley, MA 02481

Cranberry Research, Extension and Learning Center - General Bid
Post-Bid
$5,500,000 est. value
Wareham, MA 02538

Reported 05/05/2022 09:29 AM
Project Title

Fantail Student Lounge Addition

Physical Address View project details and contacts
City, State (County) Buzzards Bay, MA   (Barnstable County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status All Sub-Bids Received, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is an addition and reimagining of the existing Fantail Dining Student Lounge adjacent to the Companies 1-6 Cadet housing and the Mess Deck main dining facility. The study analyzed both a one and story scheme for additional cadet dining capacity, student social space and the ability to be utilized as function space with views of the Cape Cod Canal. The design team has explored specialty menu concepts and student lounge enhancements not currently offered on campus based on feedback from cadet focus groups. New restrooms will be constructed for the 200 new dining seats. Outdoor spaces will include a patio and landscaped area of roughly 4000 SF.

Details

College/University, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents